EV charging cable length: 5, 8 or 10 m? What the guidelines allow and how to choose (2026)

For most home parking spaces a 5 m cable is enough, and 8 m when the station is far from the charging port. Under the Electricity Administration guidelines up to 8 m is allowed, and 10 m only with a cable management system.

In short: For most home parking spaces a 5-meter cable is enough, and 8 meters is suitable when the station is far from the car's charging port. According to the Electricity Administration guidelines, the charging cable length is up to 8 meters, and up to 10 meters only on a station with a cable management system. The DSGCharge store offers 5, 8 and 10-meter cables, from ₪490.

The length of an EV charging cable seems like a small detail, but it determines whether you can park comfortably in any direction, whether the cable will drag on the floor and whether the installation complies with the guidelines. A cable that's too short forces you to park only one way, and a cable that's too long is heavy, gets tangled and lies on the ground. This guide helps you choose the right length, explains what the guidelines in Israel allow and what the difference is between the charging cable and the feed cable from the electrical panel.

All of DSGCharge's cables and adapters are gathered in the category EV charging cables and adapters.

What charging cable length do you need for a home parking space?

In most home parking spaces a 5-meter cable is enough, when the station is installed on the side where the car's charging port is located. An 8-meter cable is suitable when the station is on a distant wall, when you sometimes back in and sometimes park nose-first, or when there are two cars with charging ports on different sides.

A 10-meter cable is a solution for exceptional cases, and according to the guidelines it is permitted only on a station with a cable management system. In most cases it's better to move the station closer to the parking space than to lengthen the cable.

What do the Electricity Administration guidelines say about charging cable length?

According to section 8 of the Electricity Administration guidelines for installing an EV charging system (published on 25.11.2025), charging is done with a direct cable between the station or portable device and the car, according to the IEC 62893 standard, with a length of up to 8 meters. On a station with a cable management system, up to 10 meters is permitted.

The practical implication: plan the station's location according to the car's charging port, and don't compensate for distance with a long cable. Two more relevant rules: using an adapter between the connector and the car is prohibited (section 9), and connecting a portable charger through an extension cord is prohibited (section 12). You'll find all 18 sections in the guide Guidelines for installing an EV charging station.

5, 8 or 10 meters: what suits each situation?

The table summarizes the three common lengths, when each one is suitable and its price in the store. All the cables are intended to replace the station's cable or to be ordered with a new station, with a Type 2 connector.

Length When it fits What to check Model Store price
5 m Station on the side of the charging port, always parking in the same direction That the cable reaches the port without stretching DSG-336 ₪490
8 m Station on a distant wall, parking in both directions, two cars This is the maximum length without a cable management system DSG-337 ₪899 (instead of ₪990)
10 m Exceptional cases where the station can't be moved closer Only on a station with a cable management system, with the electrician's approval DSG-338 ₪1,190

As of November 2026. Specifications of all three cables: 3X32A, Type 2, IP65 ingress protection, 12-month warranty.

For anyone looking for a 10-meter EV charging cable: it's worth first checking with the electrician whether the station can be placed closer. If not, it is installed with a cable management system.

How do you measure the required cable length?

Measure the distance from the station's installation point to the car's charging port, in the worst parking scenario, and add a small margin so the cable won't be taut. Take the measurement with the car in the parking space, not on a plan.

  1. Check where the car's charging port is: front, rear, left side or right side. This varies between models.
  2. Measure the route the cable will actually take, around corners and wheels, not in a straight line.
  3. Think about a future car: if you change cars, the charging port may be on the other side.
  4. If it comes out to more than 8 meters, consider moving the installation point, for example to a pole next to the parking space.

There's a separate guide on choosing the station location in a private house: Where to place the charging station in the yard.

What's the difference between the charging cable and the feed cable from the electrical panel?

The charging cable connects the station to the car, and it is limited to 8 meters. The feed cable connects the electrical panel to the station, runs in a conduit or piping, and its length is determined by the distance from the panel. These are two different cables, with different prices.

When the parking space is far from the panel, you extend the feed line and install the station next to the parking space, rather than buying a long charging cable. Installation in the DSGCharge store is priced according to the length of the feed line:

Model What's included Store price
DSG-9903 Charging station installation up to 20 meters from the electrical panel ₪2,590
DSG-9904 Charging station installation up to 30 meters from the electrical panel ₪2,990

As of November 2026. According to the product description: each additional meter ₪69, not including construction work and splitting, and the final installation price is determined upon completion of the work.

What to check when the parking space is far from the panel is explained in the guide Installing a charging station in a parking space far from the electrical panel.

How do you keep the cable from dragging on the floor?

A cable lying on the floor or crossing a sidewalk can cause tripping and be damaged by being stepped on, and damage to the cable is a safety hazard. The solution is to raise the cable or protect it, using accessories that hold it above the ground.

Model What is Suitable when… Store price
DSG-406 Telescopic charging cable arm, up to 160 cm from the wall, for cables up to 18 mm in diameter The cable needs to pass over a sidewalk or path ₪690
DSG-408 Tensioning device for a charging station cable, mounted up high You want to stretch the cable over a walkway ₪790
DSG-405 Telescopic pedestal for mounting a charging station There's no wall next to the parking space, and the station is moved closer to the car ₪690

As of November 2026. Whether the accessory serves as a cable management system under section 8 of the guidelines is determined by the electrician who designs the installation.

Additional parking accessories, such as enclosures and stoppers, are explained in the guide Charging station cabinet.

What cable length do DSGCharge stations have?

DSGCharge's home and managed charging stations have a 5-meter built-in charging cable, with an 8-meter option. You can also order a station with a 10-meter cable, or replace an existing cable that was damaged.

Model Power Built-in cable Store price
DSG-1061 11kW 5 meters (8-meter option) ₪1,590 (instead of ₪2,190)
DSG-1062 22kW 5 meters (8-meter option) ₪1,790 (instead of ₪2,390)
DSG-6012 22kW, managed OCPP station 5 meters (8-meter option) ₪3,290

As of November 2026. The station price is for the station only, without installation.

At public charging stations and parking facilities, where different cars park differently each time, planning the location of the stations and cables is part of the overall design. DSGCharge also plans and sets up Setting up public charging stations.

Does a longer cable slow down charging?

Within the permitted lengths, a cable rated for the station's current shouldn't change the charging rate, which is determined by the station and the car. What matters is that the cable matches the current and the number of phases, for example 3X32A for a 22kW station.

A cable rated for a lower current than the station will limit charging. There's a detailed guide on choosing a cable by current and phases: Type 2 charging cable.

What common mistakes do people make when choosing the cable length?

The most common mistake is choosing a long cable instead of properly planning the station's location. A cable longer than necessary is heavier, harder to coil after each charge, and usually stays lying on the floor, where it gets run over and worn.

  • Measuring in a straight line. The cable goes around the car and corners, so the actual route is longer than the distance along the wall.
  • Forgetting the parking direction. If you sometimes back in, you need a cable that reaches the charging port even when the car is facing the other way.
  • Compensating for distance with an extension cord or adapter. The guidelines prohibit both, and in such a case you move the station closer or extend the feed line.
  • Leaving a cable across a walkway. When the cable crosses a path or sidewalk, raise it with an arm or a tensioning device, or run it under aCable protector speed bump DSG-432 (₪299, as of November 2026).
  • Not thinking about the next car. The charging port on your next car may be on a different side, so it's worth allowing a small margin now, within the 8-meter limit.

Who installs the station and fits the cable length?

DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations have been sold and installed, and installation and service are provided nationwide. Its products have Standards Institution of Israel (SII) approvals.

In a DSGCharge installation, the electrician chooses the station's location according to the parking space and the car's charging port, and fits the cable length. Details on the page EV charging station installation.

Want a tailored quote?

Tell us where the parking space is relative to the electrical panel and where the car's charging port is, and we'll recommend a location, cable length and installation. leave your details, check an estimate with theinstallation cost calculator Or call: 077-9920350.

Frequently asked questions

What is the maximum length of an EV charging cable?

According to section 8 of the Electricity Administration guidelines, up to 8 meters. On a station with a cable management system, up to 10 meters is permitted.

Is a 5-meter cable enough?

In most home parking spaces, yes, when the station is installed on the side of the car's charging port. If you park in several directions or the station is on a distant wall, 8 meters is worthwhile.

Can you extend a charging cable with an extension cord?

No. The guidelines prohibit an extension cord with a portable charger, and require a direct cable between the station and the car. If the cable is short, move the station closer to the parking space.

How much does a 10-meter charging cable cost?

In the DSGCharge store, the DSG-338 10 m three-phase charging cable costs ₪1,190, as of November 2026. The DSG-337 8-meter cable costs ₪899.

The parking space is far from the electrical panel. Do I need a long charging cable?

No. You extend the feed line from the panel and install the station next to the parking space. Installation up to 20 meters from the panel (DSG-9903) costs ₪2,590, and up to 30 meters (DSG-9904) costs ₪2,990.

Updated: November 2026. Sources: Electricity Administration guidelines for installing an EV charging system (25.11.2025, sections 8, 9, 12); prices and specifications from the DSGCharge store.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar