Which portable charger should you buy for an EV? Comparing 7.4, 11 and 22kW and the granny cable (2026)

Which portable EV charger should you buy? A comparison of the granny cable and 7.4, 11 and 22kW portable chargers: which socket they plug into, how long charging takes, how much it costs and what to check before you buy.

Updated: November 2026

In short: For everyday charging at home with a three-phase connection, an 11kW portable charger is the balanced choice for most cars, and with a single-phase connection, a 7.4kW charger. A 22kW charger is worth it only for a car that accepts 22kW on AC charging. All three plug into a dedicated CEE industrial socket on a separate line installed by an electrician. For occasional backup from a regular household socket, there's the granny cable.

A portable EV charger is a charger you can unplug and take with you: on one end a Type 2 connector for the car, and on the other a plug for an electrical socket. The question of which portable charger to buy depends on only three things: what electrical connection you have (single-phase or three-phase), how much power the car's onboard charger accepts, and whether you have a dedicated socket or only a regular household socket. This guide goes through each of them, with a comparison of the four portable chargers in the DSGCharge store.

All DSGCharge portable chargers, with the power rating and connector of each model, can be compared on the Portable EV chargers in the store.

Which portable EV charger is worth buying?

You choose the charger by the type of connection at home and by the power the car accepts, not by the highest number on the shelf. A charger more powerful than the car's onboard charger won't charge any faster – it will only cost more and require a bigger socket.

  • You have a three-phase connection and the car accepts up to 11kW: Portable charger 11kW (DSG-351). This is the most common match for overnight charging.
  • You have a single-phase connection: Portable charger 7.4kW (DSG-352). On single-phase, this is the highest power you can use.
  • The car accepts 22kW on AC charging and you have a large three-phase connection: Portable charger 22kW (DSG-359).
  • You only need backup for a vacation, a family visit or an emergency: Granny cable (DSG-350) for a regular household socket.

What's the difference between a granny cable and a 7.4kW, 11kW or 22kW portable charger?

The main difference is the socket you plug into and the power rating. The granny cable plugs into a regular household socket and is intended for occasional charging, while the 7.4, 11 and 22kW chargers plug into a dedicated socket with an industrial plug (CEE, also known in the field as a “Sikum”). All four models have a Type 2 connector, a 5-meter cable, a display and IP65 ingress protection.

Model Power up to Electrical connection Suitable for Warranty Store price
Granny cable DSG-350 3.7kW (adjustable current) Regular household plug, single-phase Occasional charging and backup 12 months ₪699 (instead of ₪990)
Portable charger 7.4kW DSG-352 7.4kW Dedicated single-phase CEE socket A home with a single-phase connection 12 months ₪1,190
Portable charger 11kW DSG-351 11kW Dedicated three-phase CEE socket Most homes with a three-phase connection 12 months ₪1,390
Portable charger 22kW DSG-359 22kW Dedicated three-phase CEE socket A vehicle that accepts 22kW on AC 12 months ₪1,690

Prices and specifications according to the product pages in the store, as of November 2026. The price is for the charger only, without installing the socket.

Which socket does a portable charger plug into, and what needs to be installed?

A 7.4kW, 11kW or 22kW portable charger plugs into a dedicated CEE industrial socket installed on a separate power line from the electrical panel. The line and socket are installed by a certified electrician, who chooses the socket size, the circuit breaker and the RCD according to the charger and the connection in the home. These chargers do not plug into a regular household socket.

The DSG-350 granny cable is the only one of the four that plugs into a regular household socket. According to the Electricity Administration's guidelines for installing an EV charging system (November 2025), charging from a regular household socket is intended for occasional use at a current of up to 10 amps, that is, about 2.3kW. You select the current on the cable itself.

Two important rules for any portable charger:

  • No extension cords and no power strips. Plug the charger directly into the socket. An extension cord that heats up over hours of charging is a safety hazard.
  • The plug must match the socket. Don't connect a three-phase charger to a single-phase socket through an adapter, or vice versa. If you're not sure which socket you have, take a photo of it and send it to us.

Want to estimate in advance how much the infrastructure and installation will cost? installation cost calculator gives an estimate based on the distance from the panel and the type of connection.

How long does it take to charge an electric car with a portable charger?

Charging time is roughly the amount of energy you want to add divided by the actual power. The actual power is the lowest of three: the portable charger, the socket and connection, and the car's onboard charger. The table shows an estimate for adding 30 kWh (a long daily drive) and 60 kWh (almost a full battery in a family car).

Charger Actual power kWh per hour To add 30 kWh To add 60 kWh
Granny cable from a household outlet About 2.3kW About 2.3 About 13 hours About 26 hours
Portable charger 7.4kW 7.4kW About 7.4 About 4 hours About 8 hours
Portable charger 11kW 11kW About 11 About 3 hours About 5.5 hours
Portable charger 22kW 22kW (only if the car accepts it) About 22 About 1.5 hours About 3 hours

Approximate calculation, as of November 2026: energy divided by power, without charging losses and without the slowdown near a full battery. In practice the time is slightly longer. A full table by battery size is in the guide How long does it take to charge an electric car.

To find out how much the charging itself will cost at your tariff, you can use thecharging cost calculator.

How do you know how much power your car accepts?

On AC charging, the car charges through an onboard charger (On-Board Charger), and each car has its own ceiling. In many cars the ceiling is 7.4kW or 11kW, and only in some models 22kW. You can find this figure in the car's manual or the manufacturer's specifications, under “AC charging”.

Two more things matter: a car whose onboard charger is single-phase will charge on single-phase even from a three-phase charger, so it won't take full advantage of an 11kW charger. And the home's electrical connection needs to be enough for both the home and the charging. The differences are explained in the guide Single-phase vs. three-phase, and the comparison between power ratings in the guide 11kW vs. 22kW.

Portable charger or fixed charging station: which is better?

If you have a fixed parking space and charge there every night, a fixed charging station is usually more convenient: it's mounted on the wall, stays in place, and has smart functions. A portable charger is better when you charge in several regular locations, rent your home, or want a solution that moves with you.

Portable charger 11kW / 22kW Fixed smart charging station 11kW / 22kW
Model and price DSG-351 ‏₪1,390 / DSG-359 ‏₪1,690 DSG-1061 ‏₪1,590 / DSG-1062 ‏₪1,790
What is installed A dedicated line and a CEE socket A dedicated line and the station itself
Can be taken with you Yes, anywhere with a suitable socket No, it has to be removed and reinstalled
Smart functions Display RFID, app, Bluetooth
Warranty 12 months 24 months, at the customer's home

According to the product pages in the store, as of November 2026. Station prices do not include installation; a standard installation up to 20 meters (DSG-9903) costs ₪2,590.

If you've decided on a fixed station, the guide Home EV charging station helps you choose a model, andEV charging station installation explains what the installation looks like.

What should you check before buying a portable EV charger?

Before buying, it's worth going through a short checklist. It will save you from a charger that doesn't fit your socket, or a powerful charger the car doesn't use.

  • Standards Institution of Israel approval: DSGCharge products hold Standards Institution of Israel (SII) approvals for use in Israel.
  • Car connector: Type 2, the common connector on electric cars in Israel.
  • Plug and socket: Single-phase or three-phase, and that your socket matches the charger's plug.
  • Power rating vs. the car: No more than what the car's onboard charger accepts.
  • Ingress protection: IP65 for use in open parking.
  • Cable length: 5 meters on all models. Measure the distance from the socket to the car's charging port.
  • Warranty and service: 12 months on portable chargers, with nationwide service.

Can you use a portable charger in the parking area of an apartment building?

You can, but the dedicated socket must be on a line connected to your meter, and this usually requires infrastructure work and coordination with the building committee. In most buildings, it's more cost-effective to plan managed stations in advance, with load management and billing by consumption, so all residents can charge without upgrading the building's connection.

You can read about this model on the Managed charging stations in apartment buildingspage, and about the monthly cost per resident in the guide Cost of a charging station in an apartment building.

Why buy a portable charger from DSGCharge?

DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations have been sold and installed, and installation and service are provided nationwide.

Beyond portable chargers, DSGCharge sells and installs Charging stations and accessories for homes and businesses, and sets up and manages charging systems for buildings, parking facilities and vehicle fleets. All models are available on the Portable EV chargerspage, and for those torn between a portable charger and a granny cable, there's a separate guide on Granny cable.

Not sure which charger is right for you? Send us your car model and a photo of the electrical panel or the socket, and we'll match you with a portable charger or a fixed station. to leave your details or by phone at 077-9920350.

Frequently asked questions about portable EV chargers

Can you plug an 11kW portable charger into a regular household socket?

No. 7.4kW, 11kW and 22kW portable chargers plug into a dedicated socket on a separate line with a CEE industrial plug, installed by an electrician. Only the DSG-350 granny cable plugs into a regular household socket, for occasional charging.

Will a 22kW portable charger charge any car faster?

No. The car charges according to the maximum power of its onboard charger. A car that accepts up to 11kW will charge at 11kW even from a 22kW charger, so 22kW is worth it only for a car that accepts 22kW on AC charging.

How much does a portable EV charger cost?

In the DSGCharge store, prices start at ₪699 for the granny cable, and continue to ₪1,190 for the 7.4kW charger, ₪1,390 for the 11kW charger and ₪1,690 for the 22kW charger (as of November 2026). Installation of the dedicated socket is not included.

Do you need an electrician to use a portable charger?

For a 7.4kW, 11kW or 22kW charger, yes: a certified electrician installs a separate line and a dedicated CEE socket with the appropriate protections. A granny cable needs no installation, but it is intended for occasional charging only.

What is the warranty on a portable charger?

According to the product pages, the warranty on DSGCharge portable chargers is 12 months. The warranty does not cover breakage, tears or unreasonable use.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar