Home DC charging station: who it suits, what infrastructure you need and how long charging takes

Most electric vehicle owners in Israel get along perfectly well with a home AC charging station: the car is parked all night, and the battery is full by morning. But there are homes where the night isn't enough: two or more electric vehicles, high daily mileage, a work vehicle that comes back in the evening and leaves again in the morning, or an American pickup that charges on AC over a single phase only. In these cases a Home DC charging station can be the solution. In this guide we'll explain when it's really justified and when an 11 or 22 kilowatt AC charging station is enough, what electrical connection each model needs, how long charging takes and how much it costs on the TOU tariff.

In short: A home DC charging station is suitable when you need to put a lot of energy into the vehicle in a short time, or when the vehicle's on-board charger limits AC charging. A 20kW station cuts charging of an 80 kWh battery (10%-80%) to about 3.25 hours. It requires a three-phase connection of at least 3X40, and 30-40kW stations require a larger connection. For everyone else, an AC charging station is enough.

What is the difference between an AC charging station and a home DC charging station?

An electric vehicle's battery is always charged with direct current (DC). The question is where the conversion from alternating current (AC) to direct current takes place:

  • At an AC station The conversion takes place in the vehicle's on-board charger (On-Board Charger). Even if the station can deliver 22kW, the vehicle will receive only what its on-board charger can process. In many vehicles that's 11kW, and in American pickups with a CCS1 port it's about 7kW, because they charge on AC over a single phase.
  • At a DC station The conversion takes place inside the station, and the direct current goes straight into the battery. The on-board charger no longer limits charging, and the power is determined by the station and by the maximum power the vehicle accepts on DC.

In simple terms: a home DC charging station is a small version of a public DC fast charging station, with 20-40kW of power, installed in your parking space.

AC or DC for the home: when is home DC justified and when is AC enough?

Before buying a home DC charger, it's worth answering one question: how many kilowatt-hours do you need to put into your vehicles every 24 hours, and how many hours are the vehicles really parked at home? Here's the comparison:

Parameter AC 11kW AC 22kW DC 20kW DC 30-40kW
Station price at DSGCharge (excluding installation, as of 11/2026) ₪1,590 (DSG-1061) ₪1,790-₪2,390 (DSG-1062 / DSG-1072) ₪9,428 (DSG-5120) ₪15,328 (DSG-5130) / ₪22,408 (DSG-5140)
Charging time 10%-80%, 80 kWh battery (estimate) About 6 hours About 3 hours, only in a vehicle whose on-board charger supports 22kW; otherwise the same as 11kW About 3.25 hours About 2.25 / about 1.75 hours
Electrical infrastructure Three-phase, 3X25 is usually enough Three-phase, usually 3X40 Three-phase 32A, a connection of at least 3X40 Three-phase 45A / 63A, connection upgrade or a separate connection
Vehicle limit The onboard charger The onboard charger The vehicle's maximum DC power The vehicle's maximum DC power
Suitable for Most homes: one vehicle, overnight parking Vehicles that support 22kW AC, two vehicles American pickup, work vehicle, 2+ vehicles with high mileage Small home business, farm, small fleet, charging between shifts

When AC 11/22kW is enough

  • The vehicle is parked at home for 8 hours or more on most nights.
  • Daily mileage is average, and each night only part of the battery capacity needs to be replenished.
  • Two vehicles parked all night: a dual charging station or two AC charging stations with load sharing solve this at a much lower cost.
  • Your vehicle supports 22kW AC. In that case a 22kW station will give a charging time similar to a 20kW DC station, at a much lower price.

When a fast charging station for the home is justified

  • American pickup (Silverado, Hummer and similar) with a large battery and a CCS1 port, which charges on AC over a single phase only.
  • A work vehicle that comes back in the evening and leaves again a few hours later, or a vehicle that does several rounds a day.
  • 2 or more vehicles with high mileagethat don't have time to charge one after the other at an AC charging station during off-peak hours.
  • A small home business or farm with service vehicles, pickups or vehicles that work in shifts.
  • Anyone who wants to finish all the charging within the TOU off-peak window, even when a large amount of energy needs to be put in.

How long does charging take at a home DC charging station?

The table shows estimated charging times from 10% to 80%, which is the range in which most vehicles charge at close to maximum power. This is an Conservative estimate: we assumed an efficiency of about 90% and that the vehicle accepts at least the station's power on DC. In practice, the time depends on temperature, the battery's condition and the vehicle's charging curve.

Battery (kWh) Single-phase AC 7.4kW AC 11kW DC 20kW (DSG-5120) DC 30kW (DSG-5130) DC 40kW (DSG-5140)
60 About 6.5 hours About 4.5 hours About 2.5 hours About 1.75 hours About 1.25 hours
80 About 9 hours About 6 hours About 3.25 hours About 2.25 hours About 1.75 hours
100 About 11 hours About 7.5 hours About 4 hours About 2.75 hours About 2 hours

Note: an estimate only, not manufacturer data. From 80% to 100%, most vehicles gradually reduce power, so this part takes longer relative to the amount of energy. If your vehicle accepts less than the station's power on DC, it will charge at its own power. To calculate based on your vehicle, battery and power, use thecharging time and cost calculator.

What electrical connection does a home DC charging station need?

This is the point on which most projects are decided. A DC charging station draws a high three-phase current from the grid throughout charging, and it shares the connection with the rest of the house: air conditioners, water heater, cooktop and pool pump. According to the manufacturer's specifications, the supply current of each model is:

Model Charging power Electrical connection per specifications Power from the grid (calculation: 230V x 3 phases) Connection size for the home (estimate, to be confirmed by an engineer/electrician)
DSG-5120 20kW DC Three-phase 32A About 22 kVA At least 3X40 (capacity 27.71 kVA). In a home with high consumption, a larger connection or load management may be required
DSG-5130 30kW DC Three-phase 45A About 31 kVA More than 3X40. Usually an upgrade to 3X63 or a separate connection for the station
DSG-5140 40kW DC Three-phase 63A About 43.5 kVA 3X63 for the station alone. A whole home requires a larger connection or a separate connection for the station

The last column is our estimate based on the supply current, not an official connection document. The actual connection size is determined by an engineer or electrician based on a load assessment of the home, and a request for a connection upgrade is submitted to the Israel Electric Corporation (IEC). For comparison, a 3X25 connection provides only about 17.32 kVA, so it isn't enough even for a 20kW DC station at full power.

What else needs to be checked:

  • Distance from the panel to the parking space and the cable gauge, because at currents like these they affect the cost.
  • Station location: a stable surface, protection from the weather and convenient access for the 5-meter cable (8-meter option).
  • Two or more vehicles: if there's also an AC charging station in the home, the combined load of both needs to be planned.

To estimate the installation cost based on the distance and connection type, go to theCharging station installation cost calculator.

What do the Electricity Administration's guidelines require when installing a DC charging station?

On 25.11.2025, the Electricity Administration published “Guidelines for installing an electric vehicle charging system.” According to section 18, they came into force 6 months from the date of publication, i.e. at the end of May 2026 (as of 10/2026). The key points for a home DC charging station:

  • Fixed station: DC charging (mode 4) is defined as charging “by means of a fixed charging station,” and a charging station is defined as a device “installed in a fixed installation.”
  • Dedicated circuit: The station is supplied from a final circuit dedicated to charging only, with its own circuit breaker and an isolating switch near the station (four-pole for three-phase).
  • Certificate of conformity to the standard: A DC charging station requires a certificate of conformity to IEC 61851-23 from an accredited laboratory, and the connector must comply with IEC 62196 (both CCS1 and CCS2 are defined in this standard).
  • Who installs: Design, installation and maintenance only by an electrician holding at least a “certified electrician” license.
  • Inspection before commissioning: A licensed inspecting electrician inspects the system before it is first put into operation and after any fundamental change.
  • Cable: Up to 8 meters, and up to 10 meters only for a station with a cable management system.
  • No adapters: “The use of an adapter for the electric vehicle connector is prohibited.” So you choose a station with the connector that fits your vehicle.

DSGCharge installations are carried out according to the current guidelines. For details on the process, see EV charging station installation.

How much does it cost to charge at home with a DC charging station, and how does the TOU tariff affect it?

The price per kilowatt-hour at home is the same for AC and DC. What changes the cost is the Time in which you charge. According to the Electricity Authority's tariff book (prices incl. VAT, as of 10/2026, in effect from 1.7.2026):

Tariff Agorot per kWh, incl. VAT Cost of charging 10%-80% on an 80 kWh battery (about 62 kWh from the grid, estimate)
Flat tariff 63.52 About ₪39
TOU off-peak, winter 46.63 About ₪29
TOU off-peak, summer 50.42 About ₪31
TOU peak, winter 114.70 About ₪71
TOU peak, summer 172.23 About ₪107

Peak hours: in winter (December-February) 17:00-22:00 Sunday-Thursday; in the transition seasons 17:00-22:00 Sunday-Thursday; in summer (June-September) 17:00-23:00 Sunday-Thursday. All other hours, including weekends in all seasons, are off-peak. Note: a TOU tariff plan requires a meter that measures consumption by the hour.

Here is a practical advantage of a home DC charger: it lets you put a large amount of energy in within the off-peak window, even when you have two vehicles or a pickup with a large battery, without spilling over into peak hours. The flip side of the same coin: a fast charging station tempts you to charge as soon as you get home, exactly during peak hours. In summer, charging like that costs more than 3 times as much as off-peak charging. Use scheduling in the app and start charging after the peak ends. For an exact calculation based on your vehicle and tariff plan, use thecharging time and cost calculator.

20kW DC charging station or 30-40kW: which to choose?

  • 20kW DC charging station (DSG-5120), ₪9,428 (as of 11/2026, excluding installation): the natural choice for a private home. It cuts charging time by about 40% compared with an 11kW AC charging station, and in many homes it works with a 3X40 connection.
  • DSG-5130, 30kW, ₪15,328 (as of 11/2026, excluding installation): for a work vehicle or two vehicles with large batteries, when you're prepared to upgrade the connection.
  • DSG-5140, 40kW, ₪22,408 (as of 11/2026, excluding installation): for a farm, a small business or a small fleet, when you have or are planning a large connection or a separate connection.

According to the product pages, on all three stations you choose a CCS1 or CCS2 connector; they include a built-in 5-meter cable (8-meter option), IP55 sealing, DC (6mA) and AC (30mA) leakage protection, activation via RFID, app or Plug&Charge, and a 24-month warranty. Prices are for the station only, excluding installation. You can see all the models in the category DC fast chargers.

American pickup with CCS1: why does it need a DC charging station?

Electric pickups that come from the US have a CCS1 port. When charging on AC in Israel they receive only a single phase, i.e. about 7kW, and with a very large battery a full charge takes more than 24 hours. A DC charging station with an original CCS1 connector bypasses the on-board charger and charges at the station's power. Because the use of an adapter for the vehicle connector is prohibited, the permanent solution is a station ordered with CCS1. For a full explanation, including charging times for pickup batteries, see the guide Charging station for an electric pickup.

And what about portable DC charging stations?

The DSGCharge store also has DC charging stations in a portable configuration: DSG-5020, 20kW (three-phase 32A, ₪10,990) andDSG-5030, 30kW (three-phase 45A, ₪14,990), prices as of 10/2026, excluding installation. They're compact and useful on farms and at work sites. It's important to know: according to the Electricity Administration's guidelines, DC charging is carried out by means of a station installed in a fixed installation. So before choosing a portable unit, check with an electrician or with DSGCharge how it will be installed, supplied and inspected at your site.

Why buy a home DC charging station from DSGCharge?

DSGCharge, part of S.M.C. Dor HaAtid, has been active since 2021. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own – from home AC to DC fast charging. About 20,000 chargers and charging stations sold and installed, and the installation and service teams work nationwide. This way you get the station, the infrastructure check, the installation and the service from the same company. You'll find all the products on the page EV charging stations.

How to get started?

  1. Check the vehicle registration or the manufacturer's manual for the maximum DC power, the AC power and the port type (CCS1 or CCS2).
  2. Check the connection size in the electrical panel (3X25, 3X40, etc.).
  3. Calculate charging time and cost with thecharging calculator and the installation cost with theinstallation calculator.
  4. leave your details or call 077-9920350. We'll check with you whether DC is really necessary or whether an AC charging station will be enough.

Frequently asked questions

Can a home DC charging station be installed in a private house?

Yes, provided there's a suitable three-phase electrical connection. According to the specifications, a 20kW station requires 32A per phase, i.e. a connection of at least 3X40. 30-40kW stations usually require a connection upgrade or a separate connection. Installation is carried out according to the Electricity Administration's guidelines, including a dedicated circuit and an inspection before commissioning.

How much does a DC charging station for the home cost?

At DSGCharge, a 20kW DC charging station (DSG-5120) costs ₪9,428, a 30kW one (DSG-5130) costs ₪15,328 and a 40kW one (DSG-5140) costs ₪22,408. Prices are as of 11/2026 and don't include installation. The installation cost depends on the distance from the panel and the connection size, and you can estimate it with the installation cost calculator.

Does a 20kW DC charging station charge faster than a 22kW AC charging station?

It depends on the vehicle. If the vehicle's on-board charger supports 22kW AC, charging times will be similar. If the vehicle is limited to 11kW AC, or to a single phase like American pickups, a 20kW DC charging station will charge almost 2 times faster than 11kW AC, and about 2.5 times faster than single-phase AC.

Does fast charging at home harm the battery?

20-40kW is low power relative to the DC capability of most vehicles, which receive much higher power at public charging stations. The vehicle's battery management system determines at every moment how much power to accept. In any case, it's advisable to follow the vehicle manufacturer's recommendations regarding the daily charge level.

Which connector should you choose, CCS1 or CCS2?

According to the port on the vehicle. Most electric vehicles in Israel come with CCS2, while pickups and vehicles imported from the US come with CCS1. On DSGCharge DC charging stations, you choose the connector when ordering. The Electricity Administration's guidelines prohibit the use of an adapter for the vehicle connector, so it's important to order the right connector.

When does it pay to charge at home on the TOU tariff?

During off-peak hours. As of 10/2026, the off-peak price is 46.63-50.42 agorot per kWh incl. VAT, compared with 63.52 agorot on the flat tariff and up to 172.23 agorot at the summer peak. A DC charging station lets you complete a large charge within off-peak hours.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar