Charging station for the Hyundai Kona Electric: what changes between a private home and an apartment building

A guide for Kona Electric owners who want to understand the difference in the infrastructure check and installation process between a private house and an apartment building, and how to choose the right solution for their living situation.
Charging station for the Hyundai Kona Electric: what changes between a private home and an apartment building

Anyone who has bought, or is about to receive, a Hyundai Kona Electric very quickly arrives at the most practical question: where exactly will the car be charged day to day. The answer isn't the same for everyone. Someone who lives in a private house with an accessible electrical panel and a socket of their own starts from one starting point, and someone who lives in an apartment building with a building committee, an underground parking garage and a shared main electrical panel – starts from a completely different place. This difference has nothing to do with the car model itself, but with what happens in the infrastructure behind the wall.

The most common question at this stage isn't “which charging station is best”, but “what does the process even involve for me, and what's different for my neighbor who lives in a building”. This article focuses exactly on that difference, so you know what to expect before you turn to an infrastructure check.

Why the starting point differs between a private house and a building

A home charging station doesn't operate in a vacuum – it connects to an existing electrical panel, to infrastructure already in the building, and to the power allocated to the apartment or house. With the Kona Electric, as with most electric cars sold in Israel today, routine charging is done via an AC connection, meaning alternating current fed from the grid into the car and converted internally to charge the battery. This is fundamentally different from DC fast charging stations located along highways, which are intended for short stops, not for regular home use.

In a private house, the resident is the homeowner, the owner of the electrical panel and the decision-maker. In an apartment building, the same decision passes through several parties: the apartment owner, the building committee, and sometimes also the parking garage's management company. This doesn't change the technical principle of the charging itself, but it completely changes the process of inspection, approvals and installation.

What an inspection and installation in a private house includes

In a private house the process is usually more linear: first, the existing electrical infrastructure is checked – the meter size, whether there is a single-phase or three-phase connection, and the distance between the main electrical panel and the place where the charging station will stand (usually a parking space next to the house or the entrance to the yard). This distance determines the required cable length, and sometimes also the need for trenches, digging or additional infrastructure work.

An important point to understand: the difference between a single-phase and a three-phase connection directly affects the maximum power that can be used at the home station, and accordingly the possible charging rate. This isn't something you need to “crack” on your own – a professional infrastructure check is what determines whether there is available power, whether the electrical panel needs upgrading, and which station actually suits the existing situation.

Good to know: There is no way to know in advance, without an on-site inspection, whether the existing infrastructure in the house is enough for a charging station at the desired power. The meter size, the type of connection and the distance from the panel – all of these are physically checked before any decision on the type of station.

At DSGCharge, such a process always starts with an infrastructure check before installation, precisely to avoid a situation where a customer buys a station that doesn't suit the conditions in their home, or discovers only at the end that additional unplanned work is needed. This saves time and headaches, and makes sure the station that is installed matches what actually exists behind the wall.

What's different in an apartment building

In an apartment building the picture is more complex, not technologically but organizationally. First, there is the question of usage rights: is there an assigned parking space registered in the resident's name, or is it a common parking garage without individual allocation? This determines whether a private station can be installed next to the parking space at all, or whether a different solution is required.

Second, there is the question of the building's main electrical panel and the shared electrical room. Unlike a private house, where the electrical panel belongs to the single resident, a building usually has a shared main electrical panel and sub-connections for each apartment. Connecting a charging station requires checking whether there is available power in the shared infrastructure, and how to manage it so that there is no overload when more residents want to join in the future.

This is exactly where the most significant difference between a private house and a building comes into play: load management. When a single resident charges a car at home, there is no real competition for power. But in an apartment building, once several residents install charging stations in the same parking garage, there is a real need for a solution that regulates and distributes the available power between the different stations, so as not to overload the building's main infrastructure.

This is exactly the field in which DSGCharge works with building committees and management companies – setting up a managed charging system for apartment buildings that allows several residents to charge at the same time, with smart load management that prevents exceeding the existing infrastructure, along with clear usage permissions for each resident and a payment solution that attributes consumption to each user separately. This is a fundamentally different solution from a single charging station in a private house, because it has to take everyone into account at the same time, not just one resident.

Points worth checking with the building committee before you start

  • What is the state of the infrastructure in the building's main electrical room, and what is the actual available power
  • Are there already other residents with an electric car, or are any expected to join in the near future
  • Is your parking space assigned and registered in your name, or shared by all residents
  • Is there already basic charging infrastructure in the parking garage, or is it an installation from scratch
  • Who is responsible for approving the installation – the building committee, a management company, or both

How to choose the right path for your situation

The difference between the two paths isn't only technical – it's also a difference in expectations regarding charging time and availability. In a private house, the resident usually has full control over when the station is available, so planning a charging routine is simpler: plug in in the evening, unplug in the morning. In an apartment building, even if you have a personal station next to your parking space, you may need to take into account the total power allocated to the building, and a situation in which more residents join over time.

So before choosing a station, it's worth asking yourself not only “which station suits my Kona Electric”, but “what is my actual living situation, and what does it mean for how the installation and management are done”. Those who live in a private house can move straight to an infrastructure check and individual installation. Those who live in an apartment building need to combine their personal need with a process involving the building committee, and sometimes also other neighbors who are expected to join.

If you're not sure which category you belong to, or you're just starting out and want to understand what this means in practice for your Kona Electric, you can contactDSGCharge for an initial infrastructure check that will clarify the picture – whether it's a private house or an apartment building with several interested residents.

Professional tip: If you're in an apartment building and know that other neighbors are considering an electric car, it's worth raising the issue with the committee now as a joint move, rather than each resident separately. This saves duplicate infrastructure work and makes it possible to plan proper load management for the whole building in advance.

It's important to remember that in any case – private house or apartment building – this is electrical work that must be carried out by a qualified professional and in accordance with the requirements of the law and the standard. There's no room for shortcuts here, even if the solution in a private house looks simpler at first glance. Any change to the electrical panel, adding load or connecting a new charging station requires a professional inspection, not an assessment based on the outward appearance of the panel.

In conclusion – if you own a Kona Electric and are torn between these two realities, the first step isn't choosing a station but understanding the state of your infrastructure. DSGCharge guides such processes for both private customers and building committees, and tailors the inspection and installation to the actual situation – not to a generic guide that ignores the difference between a house and a building. You can also browse the existingEV charging stations to get an initial picture, but the final decision always depends on the result of the on-site infrastructure check.

📊 In brief: key points of the article

1

Why the starting point differs between a private house and a building

A home charging station doesn't operate in a vacuum – it connects to an existing electrical panel, to infrastructure already in the building, and to the power allocated to the apartment or house. With the Kona Electric, as with most cars…

2

What an inspection and installation in a private house includes

In a private house the process is usually more linear: first, the existing electrical infrastructure is checked – the meter size, whether there is a single-phase or three-phase connection, and the distance between the electrical…

3

What's different in an apartment building

In an apartment building the picture is more complex, not technologically but organizationally. First, there is the question of usage rights: is there an assigned parking space registered in the resident's name, or…

Frequently asked questions

Is a Kona Electric charging station in a private house technically different from one in an apartment building?
The station itself can be technologically similar, but the inspection process, approvals and power management are completely different. In a private house it's a single resident's infrastructure, while in an apartment building there is usually a need for load management between several stations at the same time.
What should you check before installing a charging station in an apartment building?
It's important to check the state of the infrastructure in the building's main electrical room, the available power, whether there are already other residents with an electric car, and the parking status – assigned or common. All of these affect the type of suitable solution.
Can a charging station be installed in a private house with single-phase electricity?
It depends on the actual existing infrastructure. A single-phase connection limits the available power compared with three-phase, so this should be checked in advance to understand which station suits the existing electrical situation in the house.
What happens if several residents in a building want a charging station at the same time?
In such a case, a solution is needed that manages the distribution of power between the different stations, so there is no overload on the building's main infrastructure. This is exactly the role of a managed charging system for apartment buildings.
How do I start the process if the state of my infrastructure isn't clear?
The first step is a professional on-site infrastructure check that will clarify what exists and what is required – whether it's a private house or an apartment building. This is the only way to know for sure which station suits the actual situation.
Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 