Moving to a house with a yard? How to choose where to place your charging station before installing anything else

A guide for anyone moving to a private house with a yard who wants to know how to choose the right location for the charging station – from infrastructure considerations and distance from the electrical panel to everyday convenience, before ordering a site survey or installation.
Moving to a house with a yard? How to choose where to place your charging station before installing anything else

You've moved into a new house with a yard, and among all the small and big decisions you need to make – where to put the sofa, how to arrange the garden – a question comes up that sounds simple but actually confuses many homeowners: where exactly should the electric vehicle charging station go? Most people think about it only when they're standing in the yard with the car, trying to picture where the cable will come from. That's exactly the point where small mistakes in location later turn into a daily problem – a stretched cable, exposure to rain and sun, or an inconvenient distance from where you actually park.

The question of the right location matters not only because of convenience. It directly affects the installation cost, the length of the cables required, and whether the charging station can be installed where you originally wanted it at all. Anyone who looks into this early, before requesting a quote or installing, saves themselves surprises later on.

Why the charging station's location affects the installation so much

EV charging station is connected to the home's electrical panel and doesn't stand on its own. This means that every centimeter of distance between the electrical panel and the place where the charging station will stand translates into an electrical cable that needs to be run – whether it goes through an external conduit, is buried in the ground, or is embedded in the wall. The greater the distance, the bigger the scope of work: digging in the yard, laying protective piping, or plastering and drywall work if the cable runs inside the house may be needed. For this reason, the location that seems most “right” to you aesthetically or operationally – for example next to the parking space at the edge of the yard – is not always the location that will also be the simplest and cheapest to install. Sometimes the difference between a location close to the electrical panel and one far from it is the difference between a few hours of work and a job that requires additional coordination, additional equipment and a longer installation time.

Location considerations related to where you actually park, not just to infrastructure

Many homeowners focus only on the technical question – “where is there electricity nearby” – and neglect the truly basic question: where does the car actually stand, day to day, during its idle hours? If your regular parking spot is at the entrance to the yard, but the electrical panel is at the other end of the house, there are two opposing considerations that need to be reconciled. It's important to think about actual charging behavior, not just geometric location:

  • Where does the car come back to park at the end of the day – is it a fixed spot or does it change?
  • Is there more than one car in the household that may need charging in the future?
  • Is there a covered spot, or one protected from rain and direct sunlight, that can extend the life of the equipment?
  • Is the charging station's cable long enough to reach the parking spot without strain or dragging on the ground?
  • Is the location easy to access at night or in bad weather too?

A location chosen only on the basis of “what's closest to the electricity” may turn out to be inconvenient in practice, and a location chosen only on the basis of “what's most convenient for the car” may turn out to be expensive and complex in terms of infrastructure. Balancing the two is exactly what advance planning is meant to solve.

What happens in an infrastructure check before deciding on a final location

Before ordering an installation, there is great value in a check that looks at the home as a whole: where the electrical panel is, what condition it's in, what the existing load in the home is, and what distance reasonably needs to be covered. This check prevents exactly the most frustrating situation – ordering a charging station, discovering that it doesn't suit the location you wanted, and starting to plan all over again. At DSGCharge, part of the ongoing work with customers moving to a private house with a yard starts exactly at this stage – understanding the condition of the home, the location of the electrical panel, and the realistic distance to the parking spot, before even talking about the type of charging station or the power. This is the right way to approach the subject: understand the infrastructure before deciding on the final location, not the other way around. A location checked in advance also lets you think ahead – if there's a chance that a second car will be added in the future, or that the yard will be redesigned, it's worth considering this already at the planning stage rather than dealing with it as a surprise later.

When it's worth considering options you didn't think of in advance

Sometimes the “obvious” location – for example next to the front door or the main parking spot – is not necessarily the best option. If there's a utility pole, a built fence or an outbuilding in the yard that is closer to the electrical panel, that location may significantly save on installation cost and complexity, even if it wasn't the first alternative that came to mind. This is also the time to check whether the home's electricity is on a single-phase or a three-phase connection, because this affects the type of charging station that suits the home and the scope of the installation work. Not every private house is connected the same way, and this is a detail worth checking early rather than assuming in advance.

A practical example: a house with a front yard and parking on the side

Take a common situation as an example – a private house where the electrical panel is on the exterior wall next to the kitchen, while the parking is on the other side of the house, across the yard. At first glance this looks like a short distance, but in practice it means the cable needs to go around the house, turn a corner, and perhaps also cross a walkway. In such a case there are usually two options: install the charging station in a location that requires extending the cable and additional routing work, or check whether a secondary power point can be added closer to the parking. Both options are valid – the question is what suits the structure of the house, the budget and future plans. This is exactly the kind of decision that is worth making after an actual check and not just based on an estimate from the balcony.

A short checklist before setting the final location

  • Mark the exact location of the electrical panel in the home and check how much spare capacity it has.
  • Mark the spot where the car actually stands in your routine, not just what looks convenient visually.
  • Check whether there are obstacles along the way – walls, paths, permanent landscaping – that will require a more complicated cable route.
  • Ask yourself whether there's a likelihood of a second car in the future, so you don't plan a location that isn't suitable for expansion.
  • Check whether there's an alternative location closer to the electrical panel that wasn't considered at first.

What happens after the location is chosen

Once there is a clear direction for the location, you can move on to the next stage – a professional infrastructure check that will confirm or correct the initial assumptions, and from there to the actual installation planning. It's important to remember that any electrical work in the home, including installing a charging station, must be carried out by a certified professional and in accordance with the legal and standard requirements – this is not a stage you skip to save time. DSGCharge accompanies such processes from the initial stage of determining the location through to the actual installation, with the final price of the project varying according to factors such as the required cable length, the distance from the electrical panel, the need for digging or routing work, the connection type (single-phase or three-phase) and the overall complexity of the installation. These are exactly the details that are checked in order to give an accurate picture before work begins on site.

If you're at the stage where you're still considering exactly where the charging station will stand in the yard, the most useful next step is to schedule an infrastructure check before making a final decision. You can do this through DSGCharge, look through theEV charging stations relevant to a private house, or check what's included in the company's professional process Before you start.

If you've already decided on a direction and the location is clear to you, you can move ahead and also look at Charging cables suited to the chosen length and route, as part of the full project planning.

Frequently asked questions

What's the difference between a charging station location close to the house and a distant location in the yard?
The main difference is in the required cable length and the complexity of the work – a location close to the electrical panel usually requires less routing work, while a distant location may require digging, extending the cable or opening an additional route. The decision also depends on everyday convenience and not just on the installation cost.

Can a charging station's location be changed after it has been installed?
Technically it's possible, but it usually means additional work – cable, routing and reinstallation. That's why it's recommended to check the location in advance and not rely on assumptions alone, to avoid the need for later changes.

What happens if the home's electrical panel is far from the parking space and there's no way to shorten the distance?
In such cases, alternatives are examined, such as a secondary power point closer to the parking space, or a cable route suited to the structure of the house. This check is done on site, because every private house is built differently and requires a solution tailored to the specific case.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 