Buying an electric car? What you must check in your home's electrical infrastructure before closing the deal

The most common mistake when buying an electric car is choosing a model and only then discovering that your home isn't ready for convenient, safe charging. This article explains what you must check in advance in your electrical infrastructure, how the location of your parking space affects the installation cost, and what the special considerations are if you live in an apartment building.

Buying an electric car? What you must check in your home's electrical infrastructure before closing the deal

The excitement is understandable: you're almost ready to close on Electric car that's new, comparing driving range, checking colors and reviewing financing plans. Then, just before signing, the question many people push aside comes up: “Wait, how are we actually going to charge it at home?”. Suddenly, the conversation shifts from the shine of the new car to the reality of the electrical panel in the parking area.

This is the critical point many people miss in the process of EV readiness. The assumption that “we'll sort it out later” can lead to unpleasant surprises: discovering that the installation is more complex and expensive than expected, that the infrastructure doesn't support fast charging, or that the station you wanted doesn't suit your home at all. The goal isn't to scare you, but to help you make an informed decision before you commit to the deal, not after it.

atDSG Charging Solutions, we know that a successful charging solution isn't just EV charging station of high quality, but a complete system tailored to your car, your home and your daily routine. That's why the preliminary check is the most important stage. The information here will help you understand what to check, but it's important to emphasize: Charging station installation is a job for a certified electrician only, and must be carried out in accordance with the law and the standards.

After the infrastructure check, you can compare the 11kW and 22kW models on the Home charging stations in the DSGCharge store.

Single-phase or three-phase: what does it mean for your charging speed?

One of the first questions that comes up is whether the home's electrical connection is single-phase or three-phase. Most of us don't deal with this day to day, but when it comes to charging a car, this difference directly affects the charging rate you'll get.

Simply put:

  • Single-phase connection: common in apartments and older houses. It usually allows charging at up to 7.4kW. This is quite enough for most drivers, who will charge the car overnight and have a full battery in the morning.
  • Three-phase connection: standard in new construction and many private houses. It allows the installation of Charging stations that are more powerful, at 11kW or 22kW, which significantly shorten charging time.

The common mistake is thinking you must have three-phase. The truth is that the choice depends on your needs. If you drive short to medium distances day to day, a single-phase connection will be entirely enough for you. If you drive long distances, come home with an almost empty battery and need maximum flexibility, a three-phase connection will give you peace of mind. This check is critical for choosing a station that suits your infrastructure, and not just the figures you saw in the car's brochure.

Connection size (amps): will your home handle the load?

Once we understand the type of connection, the next question is the size of your connection (measured in amps – A). Think of it like a water pipe: the wider the pipe (more amps), the more “water” (electricity) it can carry at once. Your home electrical panel already serves “heavy” consumers such as the air conditioner, water heater, oven and electric cooktop. A charging station is another heavy consumer.

If your connection size is 25A (common in a single-phase connection), installing a station that requires 32A is simply not possible without upgrading the infrastructure with the Israel Electric Corporation (IEC). Even if the connection is enough “on paper”, running the air conditioner and water heater while the car is charging can trip the main breaker.

This is where a solution of Load management that is dynamic comes into the picture. It's a smart component that monitors the total electricity consumption in the home and automatically regulates the car's charging rate. When the air conditioner turns on, the station slows down charging. When the home is “quiet”, it returns to full power. This way, you enjoy efficient charging without worrying about tripped breakers and without needing an expensive connection upgrade.

Parking location and distance from the electrical panel: the factor that affects installation cost

In some homes the electrical panel is right next to the parking space, and installation is simple and direct. In other cases, the panel is on another floor, on the other side of the house, or you need to cross a garden or common area to reach the parking space. The distance and route between the panel and the station location are the main factors affecting the complexity and cost of Charging station installation.

The greater the distance, the longer and more expensive the power cable needed. In addition, a complex installation may include:

  • Drilling through concrete walls.
  • Running the cable in dedicated trays to maintain aesthetics and safety.
  • Digging and preparing underground infrastructure.
  • Dealing with obstacles along the way.

That's why it's impossible to give a serious installation quote over the phone. Two homes can buy exactly the same station, but the installation costs will be completely different. A preliminary on-site inspection by a professional will let you understand the complexity of the work, get an accurate quote and avoid surprises.

Live in an apartment building? Here the rules change

If you live in a private house, the checks focus on your property. In a residential apartment building, the picture is more complex. Here it's not just about your private parking space, but about shared infrastructure, a public electrical panel and sometimes also the need for the building committee's approval.

The common mistake in buildings is “patchwork” solutions: every resident who buys an electric car “pulls” a cable from their apartment or from the public panel independently. In the short term this may seem simple, but in the long term it creates a parking garage full of cables, an uncontrolled load on the building's infrastructure and real difficulty adding more stations in the future.

The right approach in an apartment building is planning a central infrastructure with a managed charging system. Such a system allows:

  • Smart load management: The system distributes the available electricity between the active stations and prevents overloading the building's infrastructure.
  • Accurate billing: Each resident pays exactly for the electricity they consumed, usually via Separate meter or a dedicated app.
  • Future-ready infrastructure: It's easier and cheaper to add new stations as more residents switch to electric cars.

If you live in a building, it's important to check the matter with the building committee and understand what the best solution is for the whole building, not just for you. You can find more information about such solutions on theEV charging blog our

In summary: an early check is an investment, not an expense

Switching to an electric car is an exciting step, and home charging is one of its biggest advantages. To make sure the experience is smooth, convenient and safe, don't skip your homework. Checking your electrical infrastructure before the purchase will give you a full picture, prevent surprises and ensure you choose the right charging solution for you.

Instead of guessing, it's worth getting professional answers. If you're unsure and want to understand the options in your private house, apartment or apartment building, we're here to help. Contact us for advice and a suitability check, and we'll make sure your home is ready for your new car.

Questions worth asking before moving forward

Can you manage without a home charging station?

Technically, yes, by relying on public stations. However, the convenience of “refueling” the car at home overnight is one of the main advantages of an electric car. For most people, a routine without a home station will be less convenient and efficient.

If I have a single-phase connection, does that mean an electric car isn't right for me?

Not at all. It only means the charging rate will be more moderate (usually up to 7.4kW). For most drivers who cover average distances day to day, such charging overnight is entirely enough to have a full battery in the morning. The choice depends on your driving habits.

When is the right time to check the infrastructure — before or after ordering the car?

Definitely before. An early check, while you're still deciding, will give you a full picture of the expected installation costs, help you choose the right charging station, and prevent unpleasant surprises after you've already committed to the car.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 