11kW vs. 22kW charging station: the complete guide to choosing the right one for your electric car

Torn between an 11kW and a 22kW charging station? Find out what your car really needs, the difference in charging times and costs, and how to make a smart decision for the future. Professional advice here.
Comparison between an 11 kW and a 22 kW charging station in a modern home parking spot

11kW vs. 22kW charging station: the complete guide to choosing the right EV charging station

In short: For most electric cars in Israel, an 11kW charging station is enough, because their onboard charger is limited to 11kW on AC charging, and it fills a 75kWh battery in about 7 hours. A 22kW station suits a car that supports 22kW AC (about 3.5 hours for the same battery) or a business or parking facility, and requires a 3x32A three-phase connection instead of 3x16A.

DSGCharge (DSG Charging Solutions) is one of Israel's leading companies in EV charging solutions: active since 2021, with about 20,000 of its chargers and charging stations sold and installed, and it provides installation and service nationwide.

You've switched to an electric car, chosen the model, the color and the upholstery, and now you face an important decision that directly affects your daily routine: which charging station should you install? The most common dilemma is the choice between an 11kW and a 22kW charging station. At first glance, the answer seems simple – faster is better, right? Well, this is where the real story starts to get interesting. The right choice isn't a speed contest but a match to your needs. It depends closely on three key factors: the type of car you own, the electrical infrastructure in your home, and your driving habits, along with some thought about the future. In this guide, we'll break down all the variables and give you the knowledge you need to make an informed decision that will serve you faithfully for years to come.

All the models, from 11kW and 22kW home stations to managed stations, can be compared in one place on the EV charging stations from DSGCharge.

The key to understanding: what is your car's ‘onboard charger’ (and why does it determine everything)?

Before we dive into technical comparisons, it's essential to understand the most important component in this equation: the On-Board Charger, orthe electric car's onboard charger. Think of the onboard charger as a funnel. Your home charging station (which is really an AC – alternating current – station) is like a water tap that can pour water at a rate of up to 22 liters per minute. If the ‘funnel’ installed in your car can only pass 11 liters per minute, then no matter how far you open the tap, the rate of filling the tank (the battery) will be limited to 11 liters per minute. The onboard charger is effectively the ‘bottleneck’ that determines the maximum charging rate your car can accept from an AC charging station.

That's why it's important to check your car's specifications before buying a station. As of today, the vast majority of electric cars sold in Israel, including the most popular models such as the Tesla Model 3 and Model Y, Hyundai Ioniq 5/6 and Kia EV6, come with an onboard charger limited to 11kW. This means that even if you install a 22kW station, these cars will charge at only 11kW. However, the market isn't standing still. We are seeing a clear trend of growing competition in the electric car market, and new, technologically advanced premium models already come with faster charging capabilities. Cars such as the Zeekr X (in the Krypton version), the Audi e-tron and the new DS No7 already offer support for 22kW charging. This understanding of onboard charger limitations in electric cars is critical and turns the decision between 11kW and 22kW into a question of present versus future.

The car's on-board charger is the deciding factor in the maximum charging speed.
The car's onboard charger is the deciding factor in determining the maximum charging speed.

Comparison table: 11kW vs. 22kW – numbers, times and infrastructure requirements

To simplify the technical differences, we've gathered the key data in a clear table. The table compares the most important parameters between an 11kW charging station and a22kW charging station, and illustrates the effect on charging time and on the requirements of your home electrical infrastructure.

Parameter 11kW charging station 22kW charging station
Maximum power 11 kilowatts 22 kilowatts
Required electrical connection Three-phase, 16 amps (3x16A) Three-phase, 32 amps (3x32A)
Charging time (75kWh battery) About 7 hours About 3.5 hours (in a supporting car)
Common supporting cars Most cars (Tesla, Hyundai, Kia, etc.) Premium models and new models (Zeekr, Audi, DS, certain Renault EVs)
Future considerations The current standard Preparation for the future standard and your next cars

The table clearly shows that the main difference is not only in charging speed but also in infrastructure requirements. A 22kW station requires an electrical connection of double the capacity (32 amps per phase, compared with 16 amps). This may affect the installation cost and requires checking in advance whether the home electrical panel can supply 32 amps. On the other hand, in a supporting car, it cuts the charging time in half – an advantage that can be significant for some people.

When is a 22kW station the right choice (and when is it a waste of money)?

Now that we understand the technical aspects, it's time for the practical question: who is each station right for? As mentioned, the answer depends on your lifestyle and future plans. Let's look at a few scenarios that will help you place yourself on the scale.

Scenarios where a 22kW charging station is a significant advantage:

  • Owning a supporting car: This is the most obvious reason. If you've already bought, or plan to buy soon, a car like the Zeekr X or Audi e-tron that supports 22kW charging, choosing a more powerful station will let you take full advantage of the car's capabilities and dramatically shorten charging times at home.
  • Preparing for the future (future-proofing): Buying a car is a long-term investment. Even if your current car supports only 11kW charging, the next car you buy in two or three years will likely support charging at 22kW. Installing more powerful infrastructure and a more powerful station today saves the need and cost of upgrading in the future, and ensures you're ready for the next generation of electric cars.
  • Need for fast charging during the day: Do you drive long distances every day and come home at noon before heading out again? The ability to add significant range to the battery in just an hour or two (instead of 3-4 hours) can be a game changer and give you a lot of flexibility. That's why it's important to buy a car that can charge at a rate of 22kW.
  • Shared or business station: In the parking garages of apartment buildings, offices or businesses, time is critical. A 22kW station allows a higher turnover of cars, so more residents or employees can charge their cars during the workday.

Scenarios where an 11kW charging station is quite enough:

  • Owning a car limited to 11kW: For the vast majority of electric car owners in Israel today, an 11kW charging station provides the maximum charging speed the car can accept. Any investment in a more powerful station will not affect the actual charging speed.
  • Overnight charging only: Most drivers plug the car in in the evening and unplug it in the morning. A 7-hour night's sleep is more than enough to fill a battery from 0% to 100% even with an 11kW station. In this case, higher speed is simply not necessary.
  • Electrical infrastructure limitations: The standard in Israeli homes is a 3x25A electrical connection; upgrading to the connection required for a 22kW station (that is, 3x32A) is expensive, complicated or even impossible. In such a situation, an 11kW charging station is the practical and right solution.
  • Budget considerations: Naturally, the cost of an 11kW charging station and its installation is lower than that of a 22kW charging station. If budget is a key consideration and your needs don't require fast charging, 11kW is an efficient and economical solution.
With the right solution, you'll wake up every morning to a full battery and a quiet drive.
With the right solution, you'll wake up every morning to a full battery and a quiet drive.

The experts' solution: DSG Charging Solutions is here to help

Choosing between an 11kW and a 22kW charging station can be confusing, and the wrong decision can lead to wasted money or a mismatch with your future needs. This is exactly where the expertise of DSG Charging Solutionscomes in. We don't just supply equipment – we offer full professional support to make sure you get the perfect, right solution for you. We understand that the right choice isn't just a matter of numbers but of matching your car and your infrastructure. We offer A range of home charging stations that are high-quality and safe, from the world's leading brands, in both 11kW and 22kW power ratings.

Our professional team at DSG Charging Solutions will carry out a comprehensive, thorough assessment for you. We'll check your current and future car model, understand your daily and weekly driving habits, and, together with our installation team, check the existing electrical infrastructure in your home. Our goal is not to ‘push’ the most expensive product, but to match you with the right, most cost-effective solution – one that gives you peace of mind and serves you faithfully for many years. We believe that a satisfied customer is a customer who made an informed decision.

The right choice saves you time and money. Don't make the decision alone. Contact our experts for advice today for personalized advice and to find the perfect solution for you and your car. We're available for any question, with no obligation DSGCharge

Is an 11kW charging station enough for an electric car?

For most drivers in Israel – yes. An 11kW (three-phase) station adds about 55-75 km of range per hour of charging and fills a 60 kWh battery in about 6 hours – in other words, one overnight charge. Many cars are limited to 11kW on AC charging anyway, so a more powerful station won't charge them any faster.

  • Suitable for: A private house with a three-phase connection, one or two cars, normal daily driving.
  • Won't work at 11kW: On a single-phase connection, the practical power is up to 7.4kW – see Is a 7kW charging station enough andSingle-phase vs. three-phase.
  • Worth considering 22kW: When the car accepts 22kW AC, or at a business or parking facility where several cars take turns at the same station.

DSGCharge's 11kW smart charging station – DSG-1061 – costs ₪1,590 (as of October 2026). Charging times for each power rating and battery size appear in the table on the How long does it take to charge an electric car.

Frequently asked questions

Is installing a 22kW station more expensive?
Yes, the initial cost of the charging station and installation is usually higher. Installing a 22kW station requires a 32-amp three-phase connection (3x32A), which may require thicker, more expensive cables, as well as a larger dedicated circuit breaker in the electrical panel. This is compared with the 16-amp connection (3x16A) required for an 11kW charging station. In some cases, it may also be necessary to increase the home's main electrical connection with the Israel Electric Corporation (IEC). That's why it's always recommended to have an inspection done and get a quote from a certified electrician. A professional installation process through DSGCharge ensures the work is carried out with maximum safety and in accordance with all standards.
Can I use a 22kW station with a car that supports only 11kW?
Absolutely. There's no safety or technical problem with doing so. The charging station and the electric car ‘communicate’ with each other using a standard protocol. The car tells the station the maximum charging rate it can accept, and the station supplies the current accordingly. So when you connect a car that supports 11kW to a 22kW station, charging will automatically take place at 11kW. The advantage is that you're already prepared with infrastructure and a station that will suit your next car, which may support the higher speed.
What about the electrical infrastructure at home? How do I know if it's suitable?
Most houses and apartments built in Israel in recent years are equipped with a three-phase electrical connection, which is a basic requirement for both types of stations. However, the standard ‘connection size’ is 25×3 amps. Such a connection is suitable for an 11kW charging station (requires 16×3 amps), but is not sufficient to run a 22kW charging station (requires 32×3 amps) at the same time as other electrical appliances in the home such as central air conditioning, an oven, a water heater and an electric cooktop. Before any installation, a certified electrician must inspect the electrical panel and assess the infrastructure's capacity. The DSG Charging Solutions team of experts can help you assess the infrastructure and match the right solution, including assistance with the connection upgrade process if needed.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar