EV charging station warranty: what to check before buying with DSGCharge

When choosing an EV charging station, a comprehensive warranty is key to safe and efficient use over time. DSGCharge offers home and business charging solutions with professional support, service and technical support in Israel. In this article we'll explain what the warranty includes, why it matters and how to choose a reliable supplier.

EV charging station warranty: what to check before buying with DSGCharge

With the growing use of electric cars in Israel, installing home and business charging stations has become a central issue for drivers, residents and businesses. Beyond To choose a charging station that is suitable in terms of power and capability, it's important to understand the meaning of the warranty that comes with the solution. In this article we'll review what an EV charging station warranty includes, why it's critical, and how to choose a reliable supplier like DSGCharge that supports the customer all the way.

Before choosing, you can compare all DSGCharge charging stations, for homes, buildings and businesses, on the page EV charging stations.

Why is an EV charging station warranty critical?

A charging station is a complex technological system that includes electrical and electronic components. During use, faults, the need for upgrades or operational questions may arise. A comprehensive warranty ensures a professional response to faults, continuous technical support and safe, efficient use over time, giving the driver peace of mind.

Key coverage in a charging station warranty

  • Coverage for hardware faults: Repair or replacement of electrical and electronic components as needed during the warranty period.
  • Professional technical support: Customer service and availability of advice for operational questions and faults.
  • Upgrades and software updates: Periodic updates to improve performance and security in smart management systems.
  • Periodic inspections: A recommendation to carry out compliance checks as part of routine maintenance.

What does DSGCharge's comprehensive warranty include?

DSGCharge specializes in EV charging solutions with an emphasis on reliability, quality and professional service. The warranty includes full coverage for home and business charging stations, whether AC or DC, with an emphasis on performance and durability. The company provides professional advice, installation by certified electricians and technical support throughout the product's life.

  • Coverage for hardware and software faults
  • Fast, reliable repair service
  • Professional advice and guidance before and after purchase
  • Customization of charging solutions to the customer's needs
  • Installation in accordance with Israeli standards and legal requirements

Important questions before buying a charging station with a warranty

  • What is the warranty period and what exactly does it cover?
  • Does the service include repairs at the customer's home?
  • What is the level of technical support and its availability?
  • Are upgrades and software updates part of the service?
  • What are the installation conditions and required approvals?

Service and support after purchase – the foundation for peace of mind

A warranty isn't just fixing faults, but also professional support throughout the charging station's entire life cycle. At DSGCharge, we emphasize the importance of personal service, high availability and a professional response tailored to the customer's changing needs. The company helps you choose the right charging station, taking into account infrastructure, car type and charging usage, to ensure a cost-effective and efficient investment.

In summary, an EV charging station warranty is a critical component in choosing a reliable and safe charging solution. With DSGCharge you'll get a comprehensive warranty, professional service and ongoing support. We'll be happy to advise you and match you with the ideal solution.

For advice and a personalized charging solution, contact DSGCharge for a professional response and peace of mind all the way.

Frequently asked questions about EV charging station warranties

What does the warranty period on the charging station include?

The warranty period includes coverage for hardware faults, professional repair service, technical support and software updates as needed. The exact details vary according to the type of station and the purchase terms.

Can you get repair service at the customer's home?

Yes, as part of the warranty, DSGCharge provides repair service at the customer's home depending on the complexity of the fault and the location, while complying with standards and legal requirements.

What's important to check before buying a charging station with a warranty?

It's recommended to check the warranty period, the types of coverage, the availability of technical support, the installation conditions and whether updates and upgrades are included as part of the service.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar