5 questions to ask every supplier before choosing a home charging station

A short guide for electric vehicle owners who receive different quotes for a home charging station. Five concrete questions that help you understand what's really included in the quote, before comparing the number at the bottom of the page.
5 questions to ask every supplier before choosing a home charging station

You've received three quotes for a home charging station, and the numbers differ from each other in a way that isn't clear to you. One quote is ₪1,800, the second ₪3,200, and the third somewhere in between. The same station, the same vehicle and the same home – so why is the difference so big?

The answer almost always lies not in the price itself but in what it includes. A home charging station isn't a uniform off-the-shelf product – it's the result of several decisions: the type of station, the cable length, the condition of the existing infrastructure, and the amount of work needed to connect everything properly. When you compare only the bottom line without understanding what makes it up, it's easy to choose the cheapest quote and find out later that it doesn't include part of the actual work.

In this article, we'll go over five concrete questions worth asking every supplier before you decide – not to turn you into electrical experts, but so you know how to compare apples to apples.

What exactly is included in the quote

The first and most important question: “Does the price include only the station, or the full installation too?” Some quotes cover only the product itself – the charging station – and leave aside everything related to the electrician's work: running a cable from the electrical panel, connection, an infrastructure check and final approval of the work.

It's worth asking for a breakdown that lists all of the following components separately:

  • The price of the station itself (depending on the power – 7kW, 11kW or 22kW)
  • The cost of the installation work and connection to the infrastructure
  • The charging cable and its length
  • Any related work such as conduits, chiseling or drilling, if required
  • The cost of travel or a technician visit to check the infrastructure in advance

When the quote is itemized like this, it's much easier to understand why one price differs from another. A “cheap” quote may simply not include part of the work, and the difference will only show up on the final invoice.

Good to know: The final price of EV charging station installation varies according to the type of station, the power, the condition of the existing infrastructure, the cable length, the distance from the electrical panel, whether it's a single-phase or three-phase connection, the need for conduits, chiseling, drilling or excavation, and the overall complexity of the work. A serious quote should address all of these – not just the station price.

How to know whether the proposed power suits your home

The second question worth asking: “Why did you choose to offer me this particular power?” Common home charging stations usually come in 7kW, 11kW and 22kW versions, and the difference between them isn't only price – it's also a question of what your home's electrical infrastructure can actually supply.

A home with a single-phase connection can't necessarily support a 22kW station, and a serious supplier should be able to explain why they recommend a particular power – not simply offer whatever is convenient for them to sell. If you received a recommendation for high power without any explanation of an existing infrastructure check, that's a sign to ask more questions.

It's also important to understand that higher power isn't always worth the price difference if your vehicle and your charging habits don't really need it. That's exactly why it's worth asking the supplier how they arrived at the specific recommendation for you, rather than just getting a number.

Critical questions about infrastructure and cable

The third question concerns something most people don't think about in advance: the condition of the electrical panel and the distance from it to the installation point. “Did you visit the home, or was the quote given only based on a phone description?” This question reveals a lot.

A quote given without an actual infrastructure check is really an estimate – and it doesn't always match reality. A long distance from the electrical panel to the parking spot, the need for chiseling, conduits or additional work – all of these can completely change the price picture once the technician is already on site.

Additional questions worth asking on this topic:

  • What cable length is included in the quote, and what happens if a longer cable is needed
  • Does the price assume standard work, or is it tailored to my specific infrastructure
  • Does it address related construction work such as chiseling or laying conduits

A simple example: a homeowner whose electrical panel is in the basement and whose car parks in an open parking spot ten meters away will need a longer cable and sometimes conduit work too – a cost that won't appear in a general quote that doesn't include a preliminary visit.

Questions about warranty, service and support after installation

Many people focus only on the moment of installation and forget to ask what happens afterward. “If there's a fault a year from now, who do I contact?” is a question that must be asked at the decision stage, not after something goes wrong.

It's worth finding out whether the supplier offers service and support after installation too, not just a one-time sale. A company that accompanies the customer from the consultation stage through to after installation can respond faster, because it knows the system it installed itself.

In this context, DSGCharge takes a different approach from a supplier that only sells a station: the company provides an end-to-end solution that includes consultation, an infrastructure check, professional installation and a point of contact even after the station is already running at home – so the customer isn't left alone if a question or need for support comes up down the road.

How to check that the quote complies with standards and doesn't just sound good

The fifth question, and no less important: “Who will actually carry out the installation, and what are their qualifications?” In the electrical field, installation must be carried out by a certified professional and in accordance with the requirements of the law and the standard. A cheap quote that doesn't address this point may save money in the short term and cost much more in the long term, both in terms of safety and in terms of the quality of the work.

Don't hesitate to ask the supplier whether they work with professional installation teams, how the infrastructure check is carried out in advance, and what happens if the check reveals that additional work is needed beyond what was initially estimated. A supplier who answers clearly and without evasion gives a good indication of their level of professionalism.

Professional tip: When you receive several quotes, it's worth asking each supplier to list separately the cost of the station, the cost of installation, and what's included in the infrastructure check. That way the comparison will be real, and there won't be any confusion between a “low price” and a “limited scope of work”.

If you're already at the stage of comparing quotes and want to know what really suits your home or vehicle, you can browse the range of available stations in theEV charging stations or also look into EV charging cables suitable for the length and type of connection required at your home.

The safest way to compare quotes is not to look only at the bottom-line number, but to ask every supplier to answer these five questions. At DSGCharge, it's standard practice to give a detailed answer already at the consultation stage – including an explanation of the suitable power, what the process includes, and what happens after installation – so the customer can truly compare rather than just guess.

If you want an accurate picture before you decide, you can contactDSGCharge for an initial suitability check, or go straight to theDSGCharge and ask for guidance that starts right from the stage of comparing quotes.

📊 In brief: key points of the article

1

What exactly is included in the quote

The first and most important question: "Does the price include only the station, or the full installation too?" Some quotes cover only the product itself – the charging station – and leave aside…

2

How to know whether the proposed power suits your home

The second question worth asking: "Why did you choose to offer me this particular power?" Common home charging stations usually come in 7kW, 11kW and 22kW versions, and the difference between th…

3

Critical questions about infrastructure and cable

The third question concerns something most people don't think about in advance: the condition of the electrical panel and the distance from it to the installation point. "Did you visit the home, or was the quote given only based on a phone desc…

Frequently asked questions

How do you know whether a charging station quote is realistic?

A realistic quote will be itemized: it will list separately the station price, the installation cost, the cable length and the related work. If the quote is a single number without any breakdown, it's worth asking for clarification before deciding.

What is the difference between an 11kW and a 22kW charging station in terms of my decision?

The main difference is the fit with your home's existing electrical infrastructure and the installation cost. A professional supplier should check your infrastructure before recommending a particular power, not simply offer the highest power.

Does the home need to be checked before receiving a quote?

A preliminary infrastructure check gives a much more accurate picture than a phone estimate, especially when it comes to the distance from the electrical panel, the connection type and a possible need for additional work such as conduits or chiseling.

What happens if an infrastructure problem is discovered only after installation has already started?

That's exactly why you should ask in advance how the supplier handles such a scenario. A professional supplier will be able to explain how the infrastructure check is carried out before installation to minimize surprises, and how the update process works if a need for additional work is nevertheless discovered.

Does every charging station installation require a certified electrician?

Yes, installing a charging station must be carried out by a certified professional and in accordance with the requirements of the law and the standard. This is an important question to ask every supplier before moving forward, regardless of the price offered.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 