A second electric vehicle at home: when your existing charging station is enough and when you need to upgrade

A guide for homeowners with two electric vehicles: how to check whether your existing charging station can handle the load, when a second station makes sense, and why an infrastructure check before deciding saves headaches later.
A second electric vehicle at home: when your existing charging station is enough and when you need to upgrade

The first vehicle arrived a year or two ago, you installed a charging station, and everything worked smoothly. Now your partner has also switched to an electric vehicle, or you've decided to replace the family's second car – and suddenly there are two cars that need to “spend the night” next to the same electrical panel. The question that comes up right away isn't “which charging station should I buy” but a much more basic one: can what you already have at home serve two vehicles at all, or do you need to rethink the entire installation?

This isn't a theoretical question. Many families in Israel reach this situation gradually – first one electric vehicle, then a second – and discover that the solution that suited a single vehicle doesn't necessarily suit two vehicles that need to charge in the same time window, usually at night.

Anyone considering an additional station can compare the 11kW and 22kW models on the page Home charging stations in the DSGCharge store.

What actually happens when there are two vehicles and one station

A standard home charging station is designed to supply electricity to one vehicle at any given moment. If there's one station at home and two vehicles, there are in practice three ways to handle it:

  • Taking turns – one vehicle charges at certain hours, the other at different hours. This works when both drivers' schedules are flexible, but it requires constant coordination and sometimes clashes with actual needs (whoever has to leave early in the morning with an insufficiently charged vehicle).
  • Adding a second charging station – a solution that lets both vehicles charge at the same time, but requires a real check of the home's electrical infrastructure: what the existing connection size is, how much additional load can be taken on without exceeding the home's electrical limit, and where an additional station can physically be placed.
  • Upgrading to a station with load management – an intermediate solution that lets both charging sessions take place with smart distribution of the available power, so that no vehicle “steals” all the electricity from the home and the other vehicle.

The choice between these options shouldn't start with the question “which station should I buy”, but with the question that comes before it: what is actually in the home's electrical panel, and what can it deliver without risk or overload?

Infrastructure check – the stage most people skip

Many homeowners go straight to comparing prices between charging stations, and miss the stage that really determines what's possible: checking the existing electrical infrastructure. When it comes to a second vehicle, this check becomes more critical, because the demand on the system grows significantly.

The things checked at this stage include, among others, the size of the home's existing connection (single-phase or three-phase), how much load is already “taken” by other electrical appliances in the home, the distance from the electrical panel to the parking spot, and whether there's physical space and conduit infrastructure for adding a second station at all. In older homes, it sometimes turns out that the existing connection wasn't designed to take charging of even one vehicle into account, let alone two.

At DSGCharge, the infrastructure check is exactly where we start before recommending any solution – because recommending one station or two without knowing the home's actual electrical capacity is a recommendation that may turn out to be irrelevant at the moment of installation.

Load management: how two stations “talk” to each other without crashing

Suppose the infrastructure allows adding a second station. The next question is how the two stations work side by side without causing a power cut or exceeding the home's electrical limit. This is where load management comes into the picture.

A system with load management checks in real time how much electricity is available in the home after all other consumption (air conditioners, the water heater, appliances), and distributes what's left between the two charging stations accordingly. When one vehicle is already close to finishing its charge and the other has just started, the system can give higher power to the vehicle that needs it more. This is completely different from a “blind” installation of two separate stations that aren't aware of each other – a situation that can cause power cuts precisely at night, when the need for charging is highest.

This is exactly the kind of solution that requires professional planning in advance, not just buying a product off the shelf. DSGCharge designs charging systems with load management for private homes with more than one vehicle too, so that the available power is distributed in a way that suits the family's actual usage routine, not just the theory.

A real-life example: a family with different charging routines

Imagine a family in which one partner drives a short distance every day and comes back with a vehicle that still has plenty of battery left, while the other partner drives longer distances and needs a full charge every night. If both vehicles are connected to a single station, whoever gets home first “grabs” the charging, and once the second vehicle arrives, the cable has to be swapped and a new charge started – which may mean the vehicle that needs the full range in the morning doesn't reach a sufficient charge level.

In such a case, the right solution isn't necessarily “another station identical to the existing one”, but a look at actual usage patterns: who comes home when, who needs more range, and whether load management between two stations would work better than adding another station without coordination between them.

How to approach the decision without paying twice

The most common mistake when moving from one electric vehicle to two is buying an additional station “because that's what's in the store”, without first checking whether the infrastructure supports it, and without thinking about load management between the two stations. This can lead to a situation where another upgrade is needed a few months later – a double expense that could have been avoided with one organized check in advance.

A sequence of steps that works in practice:

  • Checking the existing home electrical infrastructure – connection type, available capacity, distance from the electrical panel.
  • Defining the charging routine of both drivers – when each of them needs the vehicle charged, and how much.
  • An informed decision: taking turns, a second station, or a system with load management between the two stations.
  • Actually placing the stations – including the required cable length and the distance from the parking spot to the electrical panel.
  • Installation by a certified electrician, in accordance with the requirements of the law and the standard.

The price in such cases varies significantly according to several factors: the type of station and its power, the condition of the existing electrical infrastructure, whether the home connection is single-phase or three-phase, the required cable length, the distance from the electrical panel, the need for conduits, chiseling or excavation, and whether a load management system is required between the two stations. There's no way to give a uniform price estimate without actually checking the home – and that's exactly the difference between a general quote and a quote that fits the real situation.

When to seek consultation rather than just comparing products

If you're just weighing up charging station models you've seen online, it's worth pausing for a moment to check the basics first: what's in the electrical panel, how much capacity is available, and how the two charging sessions are supposed to work side by side. This is exactly the kind of check DSGCharge carries out before recommending a solution – so that the installation you get is tailored to the home's real infrastructure and both drivers' charging routine, not just to a station that looks good on the shelf.

You can start with a simple check: see how much load there is on the existing electrical panel, write down each driver's preferred charging hours, and physically check the distance between the parking spot and the electrical panel. With this information, you can already go to a professional consultation and get a clear picture – a second station, load management, or an upgrade of what already exists.

If you're at exactly this point, you can browse theEV charging stations suitable for private homes, and if you already have a station and just need to complete the picture – also theEV charging cables that can suit a two-station configuration. But the real first step, especially when it comes to two vehicles, is an infrastructure check, not choosing a product.

In summary – before adding a station, check what you already have

Moving to a second electric vehicle at home isn't just a question of “buying another station”. It's a question of understanding the existing infrastructure, both drivers' charging routine, and properly managing the load between the two charging sessions so that no vehicle is stuck in the morning with a partial charge. Seeking professional consultation at this stage saves double upgrades and unnecessary expenses later. If you have two electric vehicles at home or expect to reach this situation soon, it's worth scheduling an infrastructure check and getting a matching charging solution based on the real situation at home, not on a guess. You can start by leaving your details via the DSGCharge or reading more about the company on theAbout DSGCharge.

FAQ

Can you install two charging stations in a home with single-phase electricity?
It depends on the available capacity in the electrical panel and the total power the stations require. Sometimes single-phase is enough for two stations with load management, and sometimes you need to check with a certified electrician about upgrading the connection. There's no blanket answer without an actual infrastructure check.

Which is better – two separate charging stations or one station with load management for two vehicles?
It depends on both drivers' charging routine and the budget. Two stations with load management allow flexible simultaneous charging, while one station with cable swapping suits cases where the drivers' schedules don't clash. The decision should be based on actual use, not on a general assumption.

Can an existing charging station installed for one vehicle also “serve” a second vehicle?
One station can charge one vehicle at any given time. It can serve both vehicles in turns, but if you want simultaneous charging of two vehicles at the same time, an additional station is required, and sometimes also infrastructure adjustments and load management.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar