BYD SEAL or BYD ATTO 3: does the vehicle type change your home charging station planning?

A family torn between the BYD SEAL (sedan) and the BYD ATTO 3 (crossover) asks a practical question: does the vehicle type affect the planning of a home charging station? This article explains what really matters in the planning, and what does not depend on the chosen model at all.
BYD SEAL or BYD ATTO 3: does the vehicle type change your home charging station planning?

A situation that repeats itself in many homes: a family is about to replace their car, the debate between the BYD SEAL and the BYD ATTO 3 is nearing a decision, and someone asks a question that seems technical but is very practical – “If we choose the sedan and not the crossover, will that change anything about the charging station we need to install at home?” It's a legitimate question, because the two models look different in size, shape and everyday use, and it's natural to think that the installation will differ accordingly.

The short answer is that the vehicle type – sedan vs. crossover – mainly affects your day-to-day logic at home, not most of the engineering decisions that determine the charging station plan. The real differences that affect the installation lie elsewhere – in the home's electrical infrastructure, the location of the parking space and the distance from the electrical panel. That doesn't mean there is no difference at all, just that the difference doesn't come from where most people think it does.

DSGCharge comes across this question a lot, especially when a family is weighing two different car models before they even reach out for advice on a charging station. This section gives a clear answer: what really changes between models, and what mainly needs to be taken into account when planning for one home, even if the car hasn't been decided yet.

Why body type can affect the location of the charging station

The main difference between the BYD SEAL and the BYD ATTO 3 in terms of parking is not electrical but geometric. The SEAL is a sedan – low, elongated, with a different body line. The ATTO 3 is a crossover – taller, with completely different contours. This difference can affect one clear question: where exactly the charging port is on the car, and in which direction the car enters and parks in the space.

This matters because the charging cable length actually required, and the exact spot where the charging station will be installed on the wall, are derived from the distance between the charging port on the car and the place where the charging station is fixed. If a family parks the car in a certain direction in an assigned parking space or an underground parking garage, a change in the car's size or entry angle can slightly shift the optimal installation point – not dramatically, but enough that it's worth knowing in advance rather than after the charging station is already on the wall.

It's important to clarify: this doesn't mean that one model is “better” for charging than the other. It means that the car's geometry affects the small decision of the exact location within the parking space, not whether a charging station can be installed or which type of charging station is suitable.

Good to know: The difference between a sedan and a crossover mainly affects the exact location of the charging station within the parking space and the cable length needed, not the type of charging station, its power or the installation itself.

What to check in the parking space before choosing a final model

Instead of focusing on the question “which model requires a different charging station”, the practical check that really determines charging station planning around the BYD SEAL and BYD ATTO 3 focuses on the home itself:

  • What is the condition of the existing electrical panel – is there free space to add a dedicated charging circuit?
  • What is the distance between the electrical panel and the intended parking space – this distance determines a large part of the cost of cables, conduits and possibly digging or chiseling.
  • Is the home's connection single-phase or three-phase – a factor that affects the power options available for the charging station.
  • Is there an infrastructure limitation in the apartment building or from the building committee that requires a load management solution?
  • Where exactly the car will enter the parking space – wall, pillar or open ground – in order to choose the optimal installation point.

These checks are relevant regardless of the car model you choose. Even if it's still not clear whether it will be the SEAL or the ATTO 3, it is possible – and recommended – to carry out a professional infrastructure check early, so that the final decision on the car isn't delayed by not knowing the condition of the home.

What doesn't change in the installation process between the models

To complete the picture, it's important to note what does stay the same between the two models, because this is where most of the relief lies for anyone who is undecided: the charging station planning process itself, the infrastructure check, choosing the right power (usually between single-phase and three-phase), and even the basic installation cost – all of these are derived from the home, not from the specific car chosen.

DSGCharge specializes in exactly this kind of matching – combining the sale and installation of charging stations with a professional infrastructure check nationwide, which allows a homeowner to get one charging station plan that suits the home, regardless of whether they choose the sedan or the crossover. In other words – the installation is built around the home, not around the body type.

The only thing worth paying attention to after actually receiving the car is the exact location of the charging port on the car, to make sure that the length of the charging cable supplied with the charging station comfortably fits the parking angle. It's a small but useful detail to check with the technician during the installation or shortly before.

Want to check what suits your home without waiting for the final decision between the models? You can contact DSGCharge for details about DSGCharge and schedule a preliminary infrastructure check, so the installation is ready by the time the car arrives.

How to avoid surprises after the car has already arrived

The most common mistake is to postpone any inquiry about the charging station until after the car is already in the parking space. This creates a situation where the homeowner discovers at a late stage that there is an infrastructure limitation, that a circuit in the electrical panel needs to be upgraded, or that the distance from the electrical panel to the parking space requires a longer conduit than expected – and then the whole process is delayed exactly when you most want to start charging the new car.

The right way is the opposite: carry out the infrastructure check and the charging station planning while you are still deciding between the models, or at the latest as soon as the decision is made but the car has not yet been delivered. That way, as soon as the car arrives, the charging station is already ready and its location has already been checked against the existing parking space dimensions.

Professional tip: If you haven't yet decided between the BYD SEAL and the BYD ATTO 3, you can definitely start with an infrastructure check and early charging station planning – this check is based on the home, and doesn't require you to know the final model in advance.

It's also worth remembering that the charging station itself – the type of station, the chosen power and the right charging cable – is an investment that stays in the home for a long time, even if the car is replaced in a few years. So it's worth choosing a well-founded solution and not a “temporary solution” that will need to be changed soon. You can browse theEV charging stations and the range of EV charging cables suitable for private homes, to get an initial sense of the possible range before going for a proper consultation.

Ultimately, the decision between the BYD SEAL and the BYD ATTO 3 is a decision about the car – driving style, size, ride feel. The decision about the charging station is a completely different decision, one that depends on your home. When you separate the two decisions, the process becomes much simpler: you choose a car based on what suits you and your family, and plan the charging station separately, with someone who really understands electrical infrastructure and home charging stations. Considering the BYD DOLPHIN? We have a dedicated guide: Charging station for the BYD DOLPHIN.

DSGCharge accompanies private homeowners exactly at this stage – from an initial infrastructure check, through choosing the right power for the home connection, to professional installation in accordance with the requirements of the law and the standard. If you are deciding between the models, this is exactly the right time to get a clear picture of what your home needs, regardless of which model you choose in the end.

You are welcome to contactDSGCharge for advice and a home charging solution tailored to you, and to plan the charging station while the decision about the car is still taking shape.

📊 In brief: key points of the article

1

Why body type can affect the location of the charging station

The main difference between the BYD SEAL and the BYD ATTO 3 in terms of parking is not electrical but geometric. The SEAL is a sedan – low, elongated, with a different body line. The ATTO 3 is a crossover -…

2

What to check in the parking space before choosing a final model

Instead of focusing on the question "which model requires a different charging station", the practical check that really determines charging station planning around the BYD SEAL and BYD ATTO 3 focuses on the home itself:

3

What doesn't change in the installation process between the models

To complete the picture, it's important to note what does stay the same between the two models, because this is where most of the relief lies for anyone who is undecided: the charging station planning process itself, the infrastructure ch…

FAQ

Is a charging station suitable for the BYD SEAL different from one suitable for the BYD ATTO 3?
They are not fundamentally different charging stations. The charging station is chosen based on the home's electrical infrastructure, the required power and the distance from the electrical panel, not based on the specific car model. The difference between the models can at most affect the exact location of the charging station in the parking space and the cable length required.

Can an infrastructure check be done before the decision between the two models is final?
Yes, and it's even recommended. The infrastructure check examines the home – the electrical panel, the single-phase or three-phase connection, and the distance to the parking space – and doesn't depend on the final car model chosen.

What is the difference between a single-phase and a three-phase charging station, and what does it mean in practice?
The difference relates to the type of connection in the home and the charging power you can get from it. A professional infrastructure check determines which connection your home has, and that is the important decision in planning the charging station, far more than the type of car chosen.

Is it worth waiting until the car arrives before planning the charging station?
It's not recommended. Early planning lets you install the charging station at the same time as you receive the car, and prevents a situation where infrastructure limitations are discovered at a late stage and delay the start of using the new car.

What affects the installation price more – the car model or the structure of the home?
The structure of the home. The price is derived mainly from the type of charging station, the power, the distance from the electrical panel, the cable length, the need for conduits, digging or chiseling, single-phase vs. three-phase and the overall complexity of the installation – not from the car model chosen.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar