Before you buy an electric vehicle: what to check at home so you don't get stuck after signing the deal

Most people choose an electric vehicle model and only afterward discover that their home isn't ready for charging. The article explains what to check at home before closing the deal, what affects the installation, and how DSGCharge helps you check it in advance.
Before you buy an electric vehicle: what to check at home so you don't get stuck after signing the deal

Most people who switch to an electric vehicle do it in the wrong order. They spend weeks comparing models, reading about range, checking financing options, and finally sign a deal – and only then, when the vehicle is already on its way, do they start asking “wait, how do I actually charge this at home?”

This isn't a minor technical question. It's a question that can determine whether your day-to-day life with the new vehicle will be convenient and calm, or an exhausting cycle of charging at public charging stations, searching for a suitable outlet, and calculating every morning what percentage of battery is left.

The main problem is simple: people check a vehicle model and don't check their home. And the exact opposite is what should happen – first check what the home allows, then understand what that means for the everyday charging experience, before signing anything.

What actually gets checked at home before you decide

When we talk about a “home check” before buying an electric vehicle, we mean a few clear parameters of the existing electrical infrastructure. These aren't things you can see with the naked eye, but they're the ones that determine whether home charging will be simple or complicated:

  • Connection type in the electrical panel – whether the home has single-phase or three-phase electricity. This directly affects the maximum power you can get from a charging station.
  • The distance between the parking space and the electrical panel – a greater distance means a longer cable, and sometimes also the need for conduits, digging or additional infrastructure work.
  • The existing electrical load in the home – how much “room” is left in the electrical panel for a new charging station, without putting the home's other systems at risk.
  • The physical condition of the parking space – whether it's open, covered, inside an underground parking garage, or part of an apartment building with a building committee.

Each of these parameters can significantly change what can be installed in the home, and how complex the installation will be. It's the difference between “a station can be installed within a few hours” and “this needs to be planned in advance because there's infrastructure work”.

Good to know: The difference between single-phase and three-phase isn't a marginal technical matter – it determines the range of power ratings relevant to your home, and therefore directly affects the charging time you'll actually get and the type of station that suits the home.

How it affects the decision itself, not just the installation

It's tempting to look at this as two separate topics: “buying the vehicle” and ”installing the station”. In practice, it's one chain. If you don't check the infrastructure in advance, you may find yourself in a situation where the vehicle has already arrived, but the home installation is stuck because of additional work that wasn't taken into account, or it turns out that the power you can get at home is lower than expected.

That doesn't mean you need to cancel your purchase plan. It means the right order is: first understand what the home allows, and then decide accordingly when to close the deal on the vehicle and when to start the installation process – so that both come together around the same time, and the vehicle doesn't sit in the parking space without a convenient way to charge.

Many people choose a vehicle model and only afterward discover that their home isn't ready for it. That's exactly the point where it's worth stopping to check, instead of assuming everything will work out once the vehicle is already yours.

What happens when you combine it with the deal's timeline

A simple example: a family decides to switch to an electric vehicle and starts checking models, prices and financing terms. They're impressed by a particular model, close a deal, and a delivery date is scheduled for a few weeks later. Only at this stage do they start asking themselves how they'll actually charge the vehicle at home – and discover that their parking space is quite a distance from the electrical panel, and that they have a single-phase connection that limits the possible power. Now they need to squeeze in a planning process, equipment orders and approvals – under time pressure, because the vehicle is already on its way. If this check had been done two or three weeks before closing the deal, they could have planned the installation without pressure and synchronized it with the vehicle delivery date.

That's exactly why an early infrastructure check saves not only money, but also nerves. It gives a clear picture of what's possible and what isn't, before there's any financial commitment to the vehicle.

How to check it without delaying the purchase

An infrastructure check before installation isn't a long or cumbersome process, but it requires a qualified professional who understands both electric vehicles and the standards and legal requirements for electrical work. At DSGCharge, this is exactly one of the services that accompanies the customer already at the stage before the decision – a check that examines the panel's condition, the type of connection, the distance from the parking space and the existing load, and gives a clear answer: what can be installed, and how complex it will be.

A short checklist before closing a deal on a vehicle:

  • Check whether the home has a single-phase or three-phase connection
  • Measure (or ask for an estimate of) the distance between the parking space and the electrical panel
  • Check whether there's free space in the electrical panel to add a charging station
  • Check whether the parking space is private, common, or part of a parking facility with a building committee
  • Get a general estimate of what the installation will involve – cables, conduits, digging if needed

Keep in mind that the final price of an installation varies greatly from home to home, depending on the type of station, the required power, the cable length, the distance from the electrical panel, the need for conduits or digging, and the type of connection in the home. There's no “uniform price” that suits every home, and that's another good reason to check in advance rather than assume.

Professional tip: If you're still at the stage of comparing models and haven't closed a deal, this is exactly the right time to check your home. An early check gives you information that can affect both the choice of model and the timing of the installation – without the pressure of a delivery date.

If you're already at an advanced stage of choosing a vehicle, or you've closed a deal and want to know what to expect regarding the home installation, you can contactDSGCharge for an infrastructure check and a charging solution tailored to your home's specific situation – even before the vehicle arrives.

After checking the infrastructure and understanding what's possible, the next step is to choose the right type of station. You can explore the options in theEV charging stations, and also check what's needed in terms of EV charging cables that suit the distance and the type of connection in the home.

It's important to remember: every charging station installation must be carried out by a qualified professional, in accordance with the relevant legal and standards requirements for electrical work. A preliminary infrastructure check isn't a substitute for that, but the stage that makes sure the actual installation will be simple, safe and suited to your home.

The right order isn't “choose a vehicle and then see what happens”. It's: check what the home allows, understand the implications for the everyday charging experience, and then make a decision about the vehicle with the full picture. That's the difference between a purchase that's stressful at the start and a purchase that feels simple from day one.

If you're at the early checking stage, before closing a deal or right before receiving the vehicle, you can read more about About DSGCharge and about how a professional infrastructure check is carried out, or go directly to theCharging station and accessories store to explore the available options.

FAQ

What exactly do you need to check at home before closing a deal on an electric vehicle?
Mainly three things: the type of connection at the electrical panel (single-phase or three-phase), the distance between the parking space and the electrical panel, and the existing load on the electrical panel, which determines how much room is left for a new charging station. These parameters determine what can be installed and how complex it will be.

What is the difference between an 11kW and a 22kW charging station for my home?
The power you can get at home depends on the existing connection type – single-phase is limiting, compared to three-phase, which allows higher power ratings. So before choosing a power rating for the station, you need to check what the home's existing infrastructure allows in the first place.

Can you install a charging station in a home with single-phase power?
Yes, there are suitable solutions for homes with a single-phase connection too, but the maximum power you can get will be limited compared to a home with a three-phase connection. That's exactly why you should check the existing connection type before choosing the station.

What do you need to check before installing a charging station at home?
Beyond the type of connection, it's important to check the distance from the parking space to the electrical panel, whether conduits or digging are needed, the condition of the existing electrical panel, and the type of parking – private, common or in a parking facility. A professional infrastructure check gives an accurate answer on all of these.

How long before receiving the vehicle should you check your home?
It's best to check as early as possible – even at the stage of comparing models, and not after closing the deal. That way there's time to plan the installation without pressure and synchronize it with the actual vehicle delivery date.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 