Bought a charging station yourself? What to check before calling an electrician for installation

A guide for homeowners who have already bought a charging station on their own and are looking only for installation. It explains what happens when the installation isn't built around a proper infrastructure check, and how to prevent delays and disappointments in the process.
Bought a charging station yourself? What to check before calling an electrician for installation

You bought a charging station online, received it packed in a box, and now all that's left is to “get someone to install it.” It sounds like the simplest stage of the process – but in practice, this is exactly the stage where many homeowners run into surprises they didn't expect: an electrical panel with no room for a relay, too great a distance from the station to the car, or the discovery that the house isn't wired in a way that suits the additional load.

The problem isn't the station you bought. In most cases the station itself is fine and suitable. The problem is that installing a charging station doesn't start with mounting it on the wall – it starts with an infrastructure check. And when this step is skipped or done in a hurry, it's what causes delays, unexpected additional costs, and sometimes even the station that was bought not suiting the home's electrical situation at all.

This article is intended for exactly this situation: you have a charging station, you're looking for an electrician or a professional to install it, and before you call anyone – it's worth understanding what is checked, why it matters, and how it affects the whole process.

What exactly is checked in an infrastructure check before installation

An infrastructure check is really where it becomes clear whether your home is “ready” for the charging station you chose, and if not – what needs to be done to make it ready. It isn't a single formal check, but several practical questions that need to be answered:

First, the electrical panel is checked – whether it has free space for a dedicated circuit breaker for the charging station, and what the general condition of the panel is. An old or crowded panel may require an upgrade before a new station can even be connected. Second, the existing connection type is checked – single-phase or three-phase – because it directly affects what charging power you can actually get, even if the station itself supports higher power.

A third and important point is the distance between the electrical panel and the location where you want to install the station – in the parking space, the yard or at the entrance to the house. This distance determines the cable length, the need for conduits, and sometimes also excavation or laying pipes. Finally, it's checked whether a load relay or additional protective components need to be installed, depending on the condition of the infrastructure and the requirements of the standard.

Good to know: The power the station “supports” according to the box isn't necessarily the power you'll actually get at home. The final power depends on the existing connection type (single-phase or three-phase), the condition of the electrical panel and the existing infrastructure – which is why the infrastructure check is what determines the real picture, not the specifications on the box.

Who is responsible for what – and where your responsibility ends

When you buy a charging station yourself, your responsibility as a homeowner ends with choosing the product – not beyond that. Everything related to connecting to the electricity, matching to the existing infrastructure, compliance with the requirements of the law and the standard, and a safety inspection – this is an area that must be handled by a certified professional, and not as DIY work. That's also why it's worth approaching the installation process not as “just another small renovation job,” but as electrical work with real safety implications. An electrician who arrives at the house without knowing in advance the condition of the infrastructure may discover in the middle of the job that unplanned changes need to be made – and then the process drags on, and sometimes the cost goes up too without you having prepared for it in advance.

This is exactly where the difference comes in between “getting someone to install it” and working with a provider that first carries out a proper infrastructure check and only then proceeds to the actual installation. At DSGCharge, the process is built so that installation doesn't start “blindly” – there's a professional infrastructure check stage whose purpose is precisely to prevent this scenario, in which you discover in the middle of the job that something doesn't fit.

What a proper process looks like when you already own the station

Suppose you already have a charging station at home – you bought it in advance, or received it as part of a package. That doesn't mean you should skip the infrastructure check stage just because “the purchase has already been made.” On the contrary – this is exactly the stage where the check matters most, because it's what will tell you whether the station you own suits the existing situation, or whether adjustments are needed before connecting it. A proper process looks like this: first a professional comes and checks the electrical panel, the connection type, the distance to the desired location and the general condition of the infrastructure. Based on the findings, a decision is made – whether the station can be installed as is, whether an infrastructure adjustment is required (such as a panel upgrade or adding a load relay), and only then is the actual installation carried out, including connection, a functional check and commissioning.

This order is especially important when the station was bought separately, because there's no “closed package” here that was checked in advance against your specific home. Every home is a different case – the age of the infrastructure, the distance from the panel, the connection type, and even the location of the parking space – all of these affect exactly how the installation should be carried out.

Professional tip: Before you book an installation appointment, it's worth asking the installer to carry out a separate infrastructure check first – even if you already own the station. That way you'll know in advance whether additional work is expected (such as a panel upgrade, conduits or excavation), and you can prepare for it in advance instead of discovering it in the middle of the job.

In cases where it turns out that the existing infrastructure doesn't match the station that was bought, it's important to know that there's usually a solution – whether it's a targeted upgrade in the electrical panel, a change in the connection, or adjusting the installation location. DSGCharge also accompanies customers in situations like these, including those who come with a charging station they bought on their own, and helps them understand exactly what's required to complete the installation safely and to standard.

If you're already at this stage and looking for professional support for the infrastructure check and the actual installation, you can request advice and a tailored charging solution through DSGCharge, and get a clear picture before the actual work begins.

Points worth clarifying before ordering an installation

To avoid arriving at installation day with surprises, it's worth clarifying a few basic points in advance – even if you're not an electrician and don't expect yourself to know all the technical details:

  • What condition is the home's electrical panel in – is it relatively new or old, and does it have free space
  • Is the home's connection single-phase or three-phase
  • What's the approximate distance between the electrical panel and the desired location for installing the station
  • Is there a need for related work such as conduits, chiseling or excavation, depending on the structure of the house
  • Is the installer a certified professional who works in accordance with the requirements of the law and the standard

The answers to these questions aren't always clear in advance to the homeowner – and that's perfectly fine. That's exactly why a professional infrastructure check exists: it takes all this uncertainty and replaces it with a clear picture, before anyone starts drilling or connecting cables.

It's also important to remember that the final installation price varies according to these findings – the type of station, the power, the condition of the infrastructure, the required cable length, the distance from the electrical panel, the need for conduits or excavation, and the overall complexity of the job. There's no way to know an exact price before checking the actual situation in your specific home.

If you want to shorten the process and know exactly what condition your home is in before ordering an electrician, the right step is to schedule an infrastructure check with a provider that specializes in it. DSGCharge offers exactly this process – a combination of infrastructure check, advice and installation, so the actual installation is done only after there's a full and accurate picture of what's needed.

You can start with an infrastructure check and professional installation support through Charging station and accessories store from DSGCharge, or contact us directly for advice and a charging solution tailored to your home's situation.

📊 In brief: key points of the article

1

What exactly is checked in an infrastructure check before installation

An infrastructure check is really where it becomes clear whether your home is "ready" for the charging station you chose, and if not – what needs to be done to make it ready. It isn't a single formal check, but several…

2

Who is responsible for what – and where your responsibility ends

When you buy a charging station yourself, your responsibility as a homeowner ends with choosing the product – not beyond that. Everything related to connecting to the electricity, matching to the existing infrastructure, compliance with the requirements…

3

What a proper process looks like when you already own the station

Suppose you already have a charging station at home – you bought it in advance, or received it as part of a package. That doesn't mean you should skip the infrastructure check stage just because "the purchase has already…

FAQ

I bought a charging station myself – can I simply get an electrician to install it?
You can, but it's recommended that an infrastructure check be carried out before the installation itself – including the electrical panel, connection type and distance from the panel. Without it, there's a chance of an installation that doesn't match the actual situation of the home, or of delays in the middle of the job.

What's the difference between a single-phase and a three-phase charging station in terms of installation?
The existing connection type in the home – single-phase or three-phase – directly affects the power you can actually get from the station, even if it supports higher power. This is one of the main reasons an infrastructure check is required before installation.

What happens if it turns out that the home's electrical panel isn't suitable for the station I bought?
In such cases there's usually a solution, such as a targeted upgrade in the panel or other infrastructure adjustments. It's important to find this out in advance in an infrastructure check, and not to discover it only in the middle of the installation work.

Is there an additional cost beyond the price of the station itself?
Yes, the installation cost is separate from the station price and varies according to factors such as the condition of the infrastructure, the distance from the electrical panel, the cable length, the need for conduits or excavation, and the existing connection type in the home.

Must a charging station installation be carried out by a certified electrician?
Yes, it's electrical work that must be carried out in accordance with the requirements of the law and the standard, and only by a certified professional. A charging station must not be installed as DIY work.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 