Self-employed with one electric vehicle: how to plan charging that suits both business and private use

Self-employed people and small business owners who buy a single electric vehicle for mixed use face a different planning dilemma from a regular private homeowner. This article explains how to assess your real charging needs, what to check in your home infrastructure, and how DSGCharge guides self-employed people in matching a charging solution that suits both work trips and private routine.
Self-employed with one electric vehicle: how to plan charging that suits both business and private use

One electric vehicle, two routines. In the morning it heads out to client meetings, at noon it parks near the office or at home, and in the evening it's already part of private life – a trip to the store, driving the kids, or simply getting home after a workday. For a self-employed person or small business owner who has bought a single electric vehicle used for both professional and private needs, the question “which charging station do I need” is more complex than it seems at first glance.

Unlike a private homeowner who plans charging around one fixed routine, here there are two requirements to bridge: work trips that sometimes involve varying distances and sometimes involve consecutive busy days, versus everyday home use that simply requires the vehicle to be charged and available. The right plan isn't always the same as the standard solution for a regular home, but it also doesn't require investing in a station on the scale of a vehicle fleet.

What's different about the charging needs of a self-employed person with one vehicle

The key point many self-employed people miss is that the real question isn't “which charging station is the most powerful”, but “what does my driving routine actually look like”. A self-employed person who drives between meetings during the day and gets home in the afternoon or evening will usually enjoy a relatively long charging window – the vehicle sits at home for many hours, which takes the pressure off the exact charging speed. In contrast, a self-employed person whose vehicle is also their main work tool – for example, a business owner who travels a lot between client sites or does a delivery round – may need a faster return to a sufficient charge level, especially on busy days with back-to-back trips and no long breaks.

This difference matters because it sets the direction of thinking: is the station chosen around “convenient overnight charging” or around “the ability to charge significantly within a few hours during the day”? Both needs are legitimate, but they don't necessarily lead to the same decision.

What to check in your home infrastructure before choosing a station

Before even talking about the type of station, there's a step you must not skip: checking the existing electrical infrastructure at home or at the business. This isn't a minor technical matter – it's the foundation on which all other decisions rest.

  • Existing connection type – whether it's a single-phase or three-phase connection. The difference directly affects the maximum power that can be used at home, and accordingly the possible charging speed.
  • The existing electrical panel load – how much “room” there is in the panel to add a charging station without endangering other circuits in the home or business.
  • The distance from the electrical panel to the parking spot – a longer distance means longer cables, sometimes conduits or additional infrastructure work, and this also affects the installation cost.
  • Type of parking space – an assigned private parking space, common parking in a building, or a business area – each poses different constraints in terms of installation feasibility.

A professional infrastructure check is exactly the stage where DSGCharge comes into the picture, right at the start of the process. As a company specializing in home charging stations and professional installation nationwide, DSGCharge examines the existing infrastructure, the connection type, the panel location and the required cable run, and only on the basis of this data recommends a suitable station – instead of starting with the product and fitting reality to it.

Good to know: The decision on the type of station – 7kW, 11kW or 22kW – shouldn't be made before the infrastructure check. Sometimes the existing infrastructure at home limits the practical power that can be used, even if you buy a station with higher power on paper.

The difference between a regular charging station and a station that supports more intensive use

For a self-employed person who uses their vehicle for both work and private purposes, the practical question isn't only “how many kilowatts” but also “what does my charging routine look like over a week”. A lower-power station can be entirely sufficient for someone who parks at home for many consecutive hours every day, while someone who comes and goes more times a day, with shorter charging windows, will benefit from higher power that makes the most of every hour the vehicle is connected. This is exactly where the difference lies between “classic home” thinking and thinking that also takes the business side into account: if the vehicle is also a work tool, it's worth mapping how many days a week involve long or multiple trips, and checking whether they include a midday return home where you can “top up” with an additional partial charge. This is exactly the kind of information to bring to a professional consultation, so that the station recommendation is based on real use and not on a general assumption.

Anyone looking to start getting a sense of the available options can browse theEV charging stations intended for home use, but it's important to emphasize: the final choice should be based on an infrastructure check and real needs, not on the product specifications alone.

When to think about driving habits and not just charging speed

There's a natural tendency to think of a charging station as a purely technical product – how many kilowatts, which cable, which communication. But for a self-employed person whose vehicle serves two worlds, the right decision also requires a look at actual habits: Are there fixed days of the week with longer work trips? Are there busier seasons in terms of meetings or deliveries? Is the vehicle also used by other family members at certain hours, which could create “competition” over the availability of the charged vehicle? These questions don't always come up right away when you think about buying a charging station, but they are exactly what separates a decision that proves suitable after six months of use from a decision that requires a fix or an upgrade too early. A consultation with a professional who knows the technical side and also knows how to ask the right questions about your usage routine closes exactly this gap.

Professional tip: Before contacting us for a consultation, it's worth briefly mapping a typical week – how many days the vehicle goes out for work, how many consecutive hours it parks at home, and whether there are exceptional days with especially long trips. This information makes the matching conversation much more accurate.

Anyone who has already reached the stage of wanting to examine concrete options can contact DSGCharge for consultation and a matching charging solution. The team examines the existing connection type, the installation distance from the electrical panel and the nature of daily use – business and private alike – and accordingly plans a professional installation nationwide, whether it's a private home, a parking space attached to a small business or a residential building.

It's important to remember that in any case, the installation itself must be carried out only by a certified professional, in accordance with the requirements of the law and the relevant standard. Don't rely on a self-assessment of the infrastructure or try to install a station without a prior professional check – this is electrical work that requires knowledge and certification, not something you can do yourself.

The price of the installation itself varies according to several factors: the type of station and its power, the condition of the existing infrastructure, the required cable length, the distance from the electrical panel, whether it's a single-phase or three-phase connection, the need for conduits, chiseling or excavation, and the overall complexity of the installation. That's why any real cost estimate starts only after an infrastructure check – not before it.

Anyone who wants to start the process in an organized way can also browse theAbout DSGCharge to learn about our areas of activity, or contact us directly via the DSGCharge for an initial consultation and to schedule an infrastructure check based on the mixed use – business and private – of the vehicle.

📊 In brief: key points of the article

1

What's different about the charging needs of a self-employed person with one vehicle

The key point many self-employed people miss is that the real question isn't "which charging station is the most powerful", but "what does my driving routine actually look like". A self-employed person who drives between meet…

2

What to check in your home infrastructure before choosing a station

Before even talking about the type of station, there's a step you must not skip: checking the existing electrical infrastructure at home or at the business. This isn't a minor technical matter – it's the foundation on which all other decis…

3

The difference between a regular charging station and a station that supports more intensive use

For a self-employed person who uses their vehicle for both work and private purposes, the practical question isn't only "how many kilowatts" but also "what does my charging routine look like over a week". A station with lower po…

Frequently asked questions

Is a regular home charging station enough for someone who also uses the vehicle for work?
Usually yes, provided there's a sufficient time window between trips. Self-employed people who get home in the afternoon or evening usually enjoy a long enough charging time even with a standard-power station, but it depends on the specific driving routine.
What is the difference between a 7kW, 11kW and 22kW charging station for mixed use?
The main difference is the charging speed, that is, how long it takes to charge the vehicle at the given power. The choice between power levels also depends on the existing electrical infrastructure at home, which doesn't always allow high power to be used, so a professional infrastructure check is an essential step before deciding.
Do you need three-phase to install a charging station at home?
Not necessarily. Charging stations can also be installed on a single-phase connection, but the existing connection type affects the maximum power that can be used. Checking the infrastructure in advance clarifies which connection the home has and what it means for choosing the station.
What should you check before installing a charging station at home or at a small business?
Check the type of electrical connection, the condition and load of the existing electrical panel, the distance between the panel and the parking spot, and the nature of the parking itself – assigned, common or business. All of these affect both the technical fit and the installation cost.
How do you know whether to choose a higher-power station even though it costs more?
It depends mainly on your usage routine – if there are days with long or multiple trips and short charging windows, higher power may be more suitable. A consultation that takes into account both business and private habits gives a more accurate picture than a decision based only on technical specifications.
Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar