A narrow underground parking space and a distant electrical cabinet: the physical obstacles that stop a charging station installation before you even reach the building committee

A resident of an apartment building with underground parking who is considering a charging station often gets stuck not with the building committee, but with physical limitations: parking height, distance from the electrical cabinet, the location of the column. This article explains what to check before approaching the committee, and why.
A narrow underground parking space and a distant electrical cabinet: the physical obstacles that stop a charging station installation before you even reach the building committee

A resident of an apartment building who owns an electric car and starts looking into installing a charging station in their parking space usually has one expectation: that the real battle will be with the building committee. In practice, before reaching that conversation, there is a whole layer of physical limitations that determines whether the installation is possible, simple, complex – or impossible in the current location without a design change.

Underground parking is not regular private parking. It has limited height, concrete columns, drainage channels, piping, and sometimes a considerable distance from the building's main electrical cabinet. Each of these parameters can completely change the scope, complexity and nature of the installation – even before talking about approvals.

This article examines the three physical obstacles that keep recurring in underground parking: the parking height, the location of the column relative to the car, and the distance from the electrical cabinet. The goal isn't just to understand the problem – but to know exactly what to check before submitting a formal request to the building committee.

Parking height and mounting the charging station

Many underground parking garages were built relatively low, especially in older buildings that didn't plan for future electrical infrastructure. This means that the charging station – even when it's compact – needs to be placed where it doesn't block passage, doesn't touch water pipes or sprinklers, and doesn't clash with protruding support beams.

In practice, this isn't just an aesthetic question. A low ceiling also limits the length of cable that can be run safely and neatly, and sometimes requires a different routing than expected – for example, running the cable down inside a tray attached to the ceiling instead of a direct path. Every such deviation affects the wiring length, the amount of materials and the actual working time.

Good to know: Not every underground parking space is suitable for a “standard” installation. A low ceiling, protruding beams or existing service trays may require a customized installation solution, so an early infrastructure check saves surprises later – both in terms of cost and in terms of the actual location.

The location of the column and the distance from the car

In underground parking, the location of the column – a structural concrete column that supports the building – can determine the entire geometry of the installation. If the parking space is next to a column, there is sometimes a natural corner exactly where the charging station can be installed without interfering with vehicle or pedestrian traffic. But if the column is in a problematic location – for example, directly in front of the parking space rather than beside it – this may require rethinking the installation point, or running a longer cable than planned at first glance.

Here a practical question arises: should the charging station be close to the car's front corner, the rear corner, or the side? Most electric cars charge from a port located in a defined area of the car (usually front or rear side), so the location of the existing column in the parking space doesn't always correspond to the location of the car's charging port – and this is exactly where it's worth checking actual distances rather than estimating “roughly”.

The distance from the electrical cabinet – the parameter that determines the cost

This is the obstacle that usually has the biggest effect on the financial and technical scope of the installation. In underground parking, the main electrical cabinet (or the electrical panel relevant to the parking) can be very close to the parking space – or dozens of meters away, at the other end of the level.

What this means in practice: the greater the distance, the more cable is required, and sometimes an additional protective tray, chiseling or fastening along a wall and ceiling are also needed to run the cable in a compliant and safe way. This is also where the question of single-phase vs. three-phase plays a role – a three-phase connection usually requires more careful planning of the cable route and matching to the existing infrastructure in the panel.

Professional tip: Before submitting a formal request to the committee, it's worth measuring (or asking for an estimate of) the distance between your parking space and the nearest relevant electrical cabinet. This is the single figure that most affects the cost and complexity of installation in an apartment building, so it's worth checking early – even before the stage of approvals and discussions.

How to check this before approaching the committee

Many residents approach the building committee with a general request – “I want a charging station in my parking space” – without physical information to back up the request. This leads to a long discussion, and sometimes to rejection, because the committee has no tools to assess whether the installation is possible and how much it will actually cost. The right way to start isn't with a conversation with the committee, but with a preliminary infrastructure check: what the parking height is, what the distance from the electrical cabinet is, whether a column or wall is in the way, and whether there is reasonable access for running a cable. Such a check, carried out by a qualified professional, gives the resident a clear answer – “yes, it's possible, with this scope” or “there's a limitation that requires an alternative solution” – and only then does approaching the committee make sense.

atDSGCharge This is exactly the stage where the process begins: a nationwide infrastructure check that looks at the real physical parameters of the parking space – height, distance from the electrical panel, column locations, required cable length and single-phase vs. three-phase – and translates them into a clear picture before talking about committee approval. This check is designed to prevent a situation in which a resident comes to the committee with a request, receives approval in principle, and then it turns out that the actual installation is much more complex than expected.

It's important to emphasize: the installation itself, including all electrical work, chiseling, trays and connection to the panel, must be carried out by a qualified professional only and in accordance with the relevant legal and standard requirements. The purpose of an early infrastructure check isn't to skip this stage – but to come to it prepared, with an accurate picture of what's needed.

If you're residents of a building with underground parking and are considering a charging station, it makes sense to reverse the usual order: instead of starting with the committee and moving on to a technical check, you can start with an infrastructure check by DSGCharge, and come to the committee with clear data on height, distance and location – which shortens the discussion and prevents surprises later. Anyone who wants to start a feasibility check now, before formally approaching the building committee, is welcome to contact us for advice and a tailored charging solution, and get an accurate picture of their specific case.

You can also first get an impression of the range of relevant EV charging stations andThe charging cables to get a general idea of the types of solutions available – before starting the focused check of your specific parking space.

📊 In brief: key points of the article

1

Parking height and mounting the charging station

Many underground parking garages were built relatively low, especially in older buildings that didn't plan for future electrical infrastructure. This means that the charging station – even when it's compact…

2

The location of the column and the distance from the car

In underground parking, the location of the column – a structural concrete column that supports the building – can determine the entire geometry of the installation. If the parking space is next to a column, there is sometimes…

3

The distance from the electrical cabinet – the parameter that determines the cost

This is the obstacle that usually has the biggest effect on the financial and technical scope of the installation. In underground parking, the main electrical cabinet (or the electrical panel relevant to the parking) can be very close…

Frequently asked questions

What is the minimum parking height suitable for installing a charging station?
There is no single number that fits all cases, because it depends on the type of station, the exact installation location and existing obstacles such as beams or trays. The accurate way to check this is an actual infrastructure check in the parking area, not a general estimate.

What do you do if the electrical cabinet is very far from the parking space?
A large distance from the electrical cabinet doesn't necessarily rule out the installation, but it affects the cable length, the need for protective trays and sometimes the total cost as well. This is exactly the parameter worth checking in advance to understand the full scope before approaching the committee.

Should you approach the building committee before or after the infrastructure check?
It's recommended to carry out an initial infrastructure check before formally approaching the committee. This way you come to the discussion with concrete data – height, distance, column locations – instead of a general request that is hard for the committee to assess.

What's the difference between a single-phase and a three-phase connection in terms of distance from the panel?
A three-phase connection usually requires more precise planning of the cable route and the connection to the electrical panel, so over long distances it has a greater effect on the complexity and cost of installation compared with single-phase. The choice between the two depends on the existing infrastructure and the actual needs.

Who is qualified to carry out the installation in underground parking in an apartment building?
The installation, including all electrical work, must be carried out by a qualified professional only and in accordance with legal and standard requirements. This also applies to underground parking in apartment buildings, where there are usually additional limitations related to the building's common infrastructure.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 