A resident of an apartment building who owns an electric car and starts looking into installing a charging station in their parking space usually has one expectation: that the real battle will be with the building committee. In practice, before reaching that conversation, there is a whole layer of physical limitations that determines whether the installation is possible, simple, complex – or impossible in the current location without a design change.
Underground parking is not regular private parking. It has limited height, concrete columns, drainage channels, piping, and sometimes a considerable distance from the building's main electrical cabinet. Each of these parameters can completely change the scope, complexity and nature of the installation – even before talking about approvals.
This article examines the three physical obstacles that keep recurring in underground parking: the parking height, the location of the column relative to the car, and the distance from the electrical cabinet. The goal isn't just to understand the problem – but to know exactly what to check before submitting a formal request to the building committee.
Parking height and mounting the charging station
Many underground parking garages were built relatively low, especially in older buildings that didn't plan for future electrical infrastructure. This means that the charging station – even when it's compact – needs to be placed where it doesn't block passage, doesn't touch water pipes or sprinklers, and doesn't clash with protruding support beams.
In practice, this isn't just an aesthetic question. A low ceiling also limits the length of cable that can be run safely and neatly, and sometimes requires a different routing than expected – for example, running the cable down inside a tray attached to the ceiling instead of a direct path. Every such deviation affects the wiring length, the amount of materials and the actual working time.
The location of the column and the distance from the car
In underground parking, the location of the column – a structural concrete column that supports the building – can determine the entire geometry of the installation. If the parking space is next to a column, there is sometimes a natural corner exactly where the charging station can be installed without interfering with vehicle or pedestrian traffic. But if the column is in a problematic location – for example, directly in front of the parking space rather than beside it – this may require rethinking the installation point, or running a longer cable than planned at first glance.
Here a practical question arises: should the charging station be close to the car's front corner, the rear corner, or the side? Most electric cars charge from a port located in a defined area of the car (usually front or rear side), so the location of the existing column in the parking space doesn't always correspond to the location of the car's charging port – and this is exactly where it's worth checking actual distances rather than estimating “roughly”.
The distance from the electrical cabinet – the parameter that determines the cost
This is the obstacle that usually has the biggest effect on the financial and technical scope of the installation. In underground parking, the main electrical cabinet (or the electrical panel relevant to the parking) can be very close to the parking space – or dozens of meters away, at the other end of the level.
What this means in practice: the greater the distance, the more cable is required, and sometimes an additional protective tray, chiseling or fastening along a wall and ceiling are also needed to run the cable in a compliant and safe way. This is also where the question of single-phase vs. three-phase plays a role – a three-phase connection usually requires more careful planning of the cable route and matching to the existing infrastructure in the panel.
How to check this before approaching the committee
Many residents approach the building committee with a general request – “I want a charging station in my parking space” – without physical information to back up the request. This leads to a long discussion, and sometimes to rejection, because the committee has no tools to assess whether the installation is possible and how much it will actually cost. The right way to start isn't with a conversation with the committee, but with a preliminary infrastructure check: what the parking height is, what the distance from the electrical cabinet is, whether a column or wall is in the way, and whether there is reasonable access for running a cable. Such a check, carried out by a qualified professional, gives the resident a clear answer – “yes, it's possible, with this scope” or “there's a limitation that requires an alternative solution” – and only then does approaching the committee make sense.
atDSGCharge This is exactly the stage where the process begins: a nationwide infrastructure check that looks at the real physical parameters of the parking space – height, distance from the electrical panel, column locations, required cable length and single-phase vs. three-phase – and translates them into a clear picture before talking about committee approval. This check is designed to prevent a situation in which a resident comes to the committee with a request, receives approval in principle, and then it turns out that the actual installation is much more complex than expected.
It's important to emphasize: the installation itself, including all electrical work, chiseling, trays and connection to the panel, must be carried out by a qualified professional only and in accordance with the relevant legal and standard requirements. The purpose of an early infrastructure check isn't to skip this stage – but to come to it prepared, with an accurate picture of what's needed.
If you're residents of a building with underground parking and are considering a charging station, it makes sense to reverse the usual order: instead of starting with the committee and moving on to a technical check, you can start with an infrastructure check by DSGCharge, and come to the committee with clear data on height, distance and location – which shortens the discussion and prevents surprises later. Anyone who wants to start a feasibility check now, before formally approaching the building committee, is welcome to contact us for advice and a tailored charging solution, and get an accurate picture of their specific case.
You can also first get an impression of the range of relevant EV charging stations andThe charging cables to get a general idea of the types of solutions available – before starting the focused check of your specific parking space.
📊 In brief: key points of the article
Parking height and mounting the charging station
Many underground parking garages were built relatively low, especially in older buildings that didn't plan for future electrical infrastructure. This means that the charging station – even when it's compact…
The location of the column and the distance from the car
In underground parking, the location of the column – a structural concrete column that supports the building – can determine the entire geometry of the installation. If the parking space is next to a column, there is sometimes…
The distance from the electrical cabinet – the parameter that determines the cost
This is the obstacle that usually has the biggest effect on the financial and technical scope of the installation. In underground parking, the main electrical cabinet (or the electrical panel relevant to the parking) can be very close…
Frequently asked questions
What is the minimum parking height suitable for installing a charging station?
There is no single number that fits all cases, because it depends on the type of station, the exact installation location and existing obstacles such as beams or trays. The accurate way to check this is an actual infrastructure check in the parking area, not a general estimate.
What do you do if the electrical cabinet is very far from the parking space?
A large distance from the electrical cabinet doesn't necessarily rule out the installation, but it affects the cable length, the need for protective trays and sometimes the total cost as well. This is exactly the parameter worth checking in advance to understand the full scope before approaching the committee.
Should you approach the building committee before or after the infrastructure check?
It's recommended to carry out an initial infrastructure check before formally approaching the committee. This way you come to the discussion with concrete data – height, distance, column locations – instead of a general request that is hard for the committee to assess.
What's the difference between a single-phase and a three-phase connection in terms of distance from the panel?
A three-phase connection usually requires more precise planning of the cable route and the connection to the electrical panel, so over long distances it has a greater effect on the complexity and cost of installation compared with single-phase. The choice between the two depends on the existing infrastructure and the actual needs.
Who is qualified to carry out the installation in underground parking in an apartment building?
The installation, including all electrical work, must be carried out by a qualified professional only and in accordance with legal and standard requirements. This also applies to underground parking in apartment buildings, where there are usually additional limitations related to the building's common infrastructure.