A dealership selling electric vehicles without a charging station on site: what it misses with a customer who comes for a test drive

A guide for car dealership and showroom owners: what hurts credibility when there is no working charging station on site, how to choose the location and number of stations, and how DSGCharge helps with planning and professional installation.
A dealership selling electric vehicles without a charging station on site: what it misses with a customer who comes for a test drive

A customer walks into the dealership, sits in the electric vehicle that just arrived at the showroom, and asks the salesperson “Can I see how charging actually works?” – and there's no answer. There is no station, or there is a station that doesn't work, or it is blocked by another vehicle. It's a small moment, but it says a lot. A customer who comes to check out an electric vehicle comes with real questions about charging, not just about performance and upholstery color. If the dealership can't demonstrate one of the main things he came for – it affects his impression from the very first moment.

Operations managers and dealership owners, and especially showrooms that sell electric vehicles, run into this problem all the time: there is one old charging station that was installed “just to have one”, there is no thought about how many stations are really needed, and no one has checked the electrical infrastructure against the number of customers who come in each day. The result is not just inconvenience – it directly damages the trust the customer feels toward the brand he is considering buying from.

Why a charging station at a dealership is not a minor issue

When a customer comes to check out an electric vehicle, he is not only examining the vehicle – he is also examining what his daily life with it will look like. If the dealership itself does not display an active, well-maintained and accessible charging station, it signals that the company selling him an electric vehicle doesn't really live in this world. It's a small detail that affects the sense of trust, exactly the same way a neglected showroom floor affects the impression of the vehicles themselves.

There is also a direct operational side here: demo vehicles circulating among sales staff, inventory vehicles waiting in the parking lot, and sometimes employee vehicles too – all need regular charging. Without proper planning, the dealership finds itself dealing with a demo vehicle that isn't charged in the morning, or with an informal queue for the only station there is.

Good to know: The difference between “there is a charging station” and “there is a charging solution that fits the dealership's operating pace” is exactly what determines whether the customer feels confident or feels that something isn't working as it should.

Location and number of stations – how do you even decide

There is no one answer that fits every dealership, and this is exactly where most mistakes happen. A dealership with high customer traffic and several electric demo vehicles needs different planning than a small dealership with one or two electric models on display. The questions that really need to be asked are: how many electric vehicles are at the dealership on an average day, how many of them need regular charging (demo vs. inventory vs. staff vehicles), and where the customer actually sees the station – at the entrance, in the internal parking lot, or next to the showroom area.

The location of the station also affects the installation cost. A station located close to the electrical panel that does not require long trenches or excavation will cost differently from a station that requires laying a cable over a long distance, cutting or infrastructure work. This is a natural part of the conversation with any installer, not a “glitch” in the process.

In most cases, a car dealership serves not only individual customers but also the brand's own fleet vehicles, so it is worth thinking about a growth range – not just what is needed today, but how many stations will be needed if the number of electric models increases.

Managing access when there are several customers at once

A car dealership is not a home parking space. It has unpredictable traffic, salespeople moving vehicles around, and customers waiting for a test drive. One charging station serving all this traffic very quickly becomes a bottleneck – a demo vehicle occupying the station when a customer wants to see a charging demonstration, or an inventory vehicle stuck charging when it needs to be moved elsewhere.

This is where an issue that is important to understand in advance comes in: as the number of stations grows and the dealership also wants to know who charged and when, there is room to think about organized access management and usage tracking – not as an abstract technical requirement, but to actually serve several models and several different drivers without confusion.

At this point DSGCharge comes into the picture naturally: as a company specializing in AC and DC charging stations and managed charging systems for buildings, parking facilities and vehicle fleets, it has experience in building a solution that takes into account that a car dealership has several “types of users” – customer, salesperson, inventory vehicle – and not just one private driver. This is different from installing a single home charging station, so it is important that the planning be done in advance and not “after the problem already exists”.

Checking the infrastructure before adding another station

Many dealerships start with one station that they installed when the first electric vehicle arrived at the showroom, and never went back to check the infrastructure as the electric inventory grew. This is a common mistake: assuming that if one station worked, you can simply “add another one” to the same electrical panel. In practice, adding more stations requires an advance check of the electrical infrastructure – whether there is enough available capacity, whether it is a single-phase or three-phase connection, and whether any upgrade is needed before adding a station.

The final price of any station addition or charging solution expansion varies according to several factors: the type of station, the required power, the distance from the electrical panel, the need for trenches or excavation, a single-phase vs. three-phase connection, load management between several stations, communication and payment processing if relevant, and the overall complexity of the installation on site. Any electrical installation of this kind must be carried out by a qualified professional and in accordance with the law and the standard – this is not a step you skip, especially at a site with high customer traffic.

Professional tip: Before ordering another station, it is worth mapping how many electric vehicles are expected to be at the dealership a year from now – not just today. This avoids a situation where you install a solution that fits the current situation and discover six months later that it is too small.

Alongside this, it is worth checking a few simple things before meeting with an installer: how many electric vehicles (demo, inventory, fleet) are actually at the dealership; whether there is a free, reasonable location close to the electrical panel; whether you want to know who charged and when, or whether “free” charging is enough; and whether you intend to add stations in the future. Once these points are clear, the conversation with a professional goes from rushed and confused to focused and calm.

Want to check what is right for your dealership? You can start with a short review of the current situation through About DSGCharge and understand how the consultation process works.

How to start the process the right way

The first step is not “ordering a station”, but going through a short process of checking the infrastructure and matching a solution to the number of vehicles and the actual customer traffic. DSGCharge provides end-to-end solutions that combine infrastructure checks, planning, professional installation and answers for cases where several vehicles and users need to be served simultaneously – whether it is an apartment building, a parking facility, or a site with commercial traffic such as a car dealership.

When the infrastructure is checked in advance, and the number of stations is determined by real operating data rather than a general estimate, the chance of faults or a bottleneck at the station drops significantly. This is also what allows the dealership to show the customer a charging station that works, is accessible, and signals that the brand understands what it is selling.

You can also start the review by browsing in EV charging stations suitable for business use, to get an initial sense of the range of available solutions before a more detailed conversation.

The next step

If your dealership still relies on a single station or on a solution that was installed without thinking ahead, now is the time to check the current situation before the problem becomes visible to customers. DSGCharge accompanies business customers through a process that starts with an infrastructure check and ends with a charging station that actually works on site – not just on paper. You can reach out for advice and a charging solution that matches the number of vehicles and the traffic at your dealership.

Frequently asked questions

How many charging stations does a car dealership need?
It depends on the number of electric vehicles actually at the dealership – demo, inventory and staff vehicles – and their turnover rate. There is no uniform number, so it is recommended to map the actual traffic before determining the number of stations.

Can another station be added to the existing electrical panel?
Sometimes yes and sometimes no – it depends on the available capacity in the electrical panel and the type of connection (single-phase or three-phase). That is why an advance infrastructure check is a necessary step before adding a station, not just an option.

Do you need to know who charged and when at a dealership with several stations?
At dealerships serving several vehicles and different users, there is a considerable advantage to access management and usage tracking, to prevent confusion between demo, inventory and fleet vehicles. This is worth raising already in the initial planning conversation.

How much does it cost to install a charging station at a car dealership?
The price varies according to the type of station, the power, the distance from the electrical panel, the need for trenches or excavation, a single-phase vs. three-phase connection, and the overall complexity of the installation. Any quote should be based on a site-specific infrastructure check.

What is the difference between a home charging station and a station suitable for a car dealership?
A home charging station is built around one driver and one vehicle. A dealership has traffic of several vehicles and different users, so the solution must take into account loads, access and the possibility of future expansion – not just a basic connection for a single vehicle.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar