Got an EV from work? How home charging differs from a private car you bought yourself

An employee who receives an EV as a leased or company car faces questions that don't come up for someone who bought a private car: who orders the installation, what happens when the car is replaced, and how to check the infrastructure before committing. This article explains the practical differences.
Got an EV from work? How home charging differs from a private car you bought yourself

Someone from the company calls and says, “You have a new electric car – pick it up at the end of the month.” This happens far more often than you might think today – many employees receive an EV as a leased or company car without having gone through the process most articles online describe: comparing models, making a decision, and then planning a home charging station. When the car “comes ready” from the company, the first question at home is not “which station should I choose” but “who is even responsible for this, and how is my situation different from someone who bought an EV themselves?”

This difference is not just technical. It concerns who orders the installation, who pays for it, what happens at the end of the lease period, and how all of this affects the decision about which charging station to install at home in the first place. For someone who buys a private car with full ownership, home charging is a long-term investment in property that is theirs. For someone who receives a leased or company car, it is an investment in the home's infrastructure – which will keep serving them even after the current car is replaced with another, perhaps a completely different one.

If you're installing a station at home, for a company car or a private car, you can compare the 11kW and 22kW models on the Home charging stations in the DSGCharge store.

What actually differs between a charging station for a private car and one for a leased car

Electrically and technically, a home charging station doesn't “know” whether the car plugged into it is privately owned, under an operating lease, under a finance lease or a company car. The Type 2 CT36, the electrical panel, the RCD and the selected power – all of these relate to the car and the home's infrastructure, not to who holds the car. The difference is not in the equipment; it's in the decisions around it.

Someone who bought the car themselves knows almost for certain that this car will be with them for several years, so the investment in a charging station is suited to that specific car. An employee who received a leased car is in a different situation: today it's one model, in two or three years it could be a completely different model with different charging requirements. That doesn't mean you can't install a station, but it changes how you choose it – the installation should allow for future flexibility, not just the car parked in the driveway today.

For a business that manages several electric company cars, an explanation of charging, billing and reports for the whole fleet is on the EV fleet management from DSGCharge.

What people actually ask before installing a station for a company car

An employee who receives an EV from work runs into questions that someone who bought a private car deals with less:

  • Who orders and pays for the installation – the employee, the company, or is it defined in the lease agreement?
  • What happens at the end of the lease period – does the station stay at home and serve the next car?
  • If the car model is replaced in the middle of the period, does anything need to change in the station itself?
  • Is there an obligation toward the leasing company to document the installation or meet certain requirements?

The answers to these questions vary from company to company and from agreement to agreement – so it's a subject worth checking directly with your employer or the leasing company before moving forward. What stays constant, regardless of the type of arrangement for the car, is the home side: the home's electrical infrastructure, the distance from the panel, the cable type and the power the station can deliver. This is a part worth checking yourself, regardless of who financed the car.

The difference that really matters: a specific type of driving vs. a type of property – a private home

There is a difference between the charging habits of someone who drives a car they own for good and someone who knows the car will be replaced after a while. But this difference shouldn't affect the decision about where and how to install the charging station in a private home – because the home stays, even if the car changes. In a private home, the electrical panel, the distance from the connection point to the parking space and the type of cables already in the wall – all of these are fixed factors that don't depend on the car model or the type of arrangement.

This is the point employees who receive a leased car need to take to heart: the home installation is an investment in the home, not in the car. A properly installed charging station can also serve the next car, even if it's a different model, as long as the power and infrastructure are suitable. That's why an infrastructure check before installation is more important with a leased car, not less – because the decisions made today need to stay relevant even when the car in the parking space changes.

At DSGCharge, we often hear from employees who call at exactly this stage – they've been told the car is arriving in a few weeks and want to know what's possible and what to check at home before moving forward. Part of the process the company carries out is an actual infrastructure check: how far it is between the electrical panel and the parking space, whether single-phase or three-phase is needed, and what power the home can support without affecting the home's other electrical needs.

What happens when you replace or return the car

A recurring situation among employees with a leased car: at the end of the agreement period, the car is returned, and the next car is sometimes a different model, sometimes even a different manufacturer. The question that comes up then is whether the station installed at home is still suitable. In many cases, if the station was installed at a reasonable power and with a standard-compliant cable and connection (Type 2, which is used by most EVs sold today), it keeps serving the next car without any changes. In other cases, depending on the requirements of the specific car, an adjustment may be needed – but this is checked in practice, not something that can be determined in advance without knowing the details.

That's why, when an employee asks about a charging station for a leased car, it's worth looking at the subject from the perspective of “what's good for the home in the long run,” not just “what suits the car I have today.” This is the main difference between planning for a private car and planning for someone who knows the car itself is a variable.

A short checklist before you contact an installer

  • Check with your employer or the leasing company who is responsible for financing the installation and what happens at the end of the agreement
  • Check the connector type and charging power of the car you actually received
  • Check the distance between the electrical panel and the parking spot at home – it affects the cable length and the complexity of the installation
  • Check whether your home has a single-phase or three-phase connection, because it affects the possible power
  • Ask whether the leasing company has a documentation requirement for the installation

All of these checks can be done as part of an infrastructure check carried out before installation – a step recommended for every homeowner who wants a charging station, whether the car is fully owned or a company car. DSGCharge specializes in infrastructure checks and professional installation planning for private homes, with the goal of matching the solution to the home and not just to the car currently in it – so that even if the car is replaced in two years, the station stays relevant.

What happens when the installation is needed quickly

Employees who are told about a leased car usually also get a timeline – the car will arrive in a few weeks, and they want to start charging at home from day one. This is real pressure, but it shouldn't lead to compromising on the infrastructure check. A station installed without a proper check may be unsafe or unsuitable for the actual power, and that's something to avoid even under time pressure.

The installation itself, like any electrical work, must be carried out by a qualified professional in accordance with the requirements of the law and the standard. The price varies depending on the station type, the selected power, the condition of the existing infrastructure, the required cable length, the distance from the electrical panel, whether the connection is single-phase or three-phase, the need for conduits, chiseling or drilling, and the overall complexity of the installation. It isn't right to promise a fixed price without actually checking the home.

The bottom line

An employee who receives an EV as a leased car starts from a different point than someone who bought an EV themselves – but investing in a home charging station is still relevant and worthwhile, because it serves the home and not just the current car. The right way to deal with this uncertainty is not to postpone the decision, but to carry out a proper infrastructure check that gives a clear answer about what can be installed at home, regardless of questions about the lease agreement itself. DSGCharge offers infrastructure checks and installation planning for private homes, including matching to the required power and the home's existing electrical connection, as a first step before any commitment. If you want to understand what's right for your home, you can browse theEV charging stations on the website, or contactDSGCharge directly for advice and a home charging solution tailored to you, regardless of who owns the car parked in your driveway today.

Who is responsible for financing the charging station when you get a leased car from work?

It varies from agreement to agreement and depends on the employer or the leasing company – some agreements address it explicitly and some don't. We recommend checking this directly with your employer before installation.

Will a charging station installed for one car also suit the next car replaced under the lease?

In most cases, if the station was installed with a standard-compliant connection and its power matches the general needs of common EVs, it can also serve a replacement car. Still, we recommend checking the exact details case by case.

Is an infrastructure check before installation more important with a company car?

An infrastructure check is important for every installation, but it has special significance with a car that may be replaced, because the investment is meant to serve the home for the long term and not just the current car.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar