One electric vehicle and one gasoline car in the same yard: how to plan a charging station that won't get in the way of the other car

A guide for households with an electric car and a gasoline car: how the location of the charging station affects parking and movement in the yard, what to check before installation, and how to leave room for a second electric car in the future.
One electric vehicle and one gasoline car in the same yard: how to plan a charging station that won't get in the way of the other car

There's a familiar moment in the switch to an electric car, and it has nothing to do with the charging itself. It's the moment you realize that the old gasoline car, the one that continues to serve one of the parents or for long trips, still needs to stop in the same yard, enter the same driveway, and sometimes share the same parking area with the new electric car. In most private houses in Israel, parking isn't built from scratch for a charging station – it's planned around parking that has existed for decades, with a second car that continues to use it.

This is exactly the point where it's worth pausing before rushing to order a station and hang it on the first wall that looks convenient. A well-placed charging station works quietly in the background. A station placed without thinking about the second car can become a source of daily friction – a cable crossing the driving path, a car door that opens and gets stuck, or a situation where you have to “dance” around the other car just to charge.

Why the station's location matters more than its power rating

Many homeowners focus on whether to choose a 7 kilowatt, 11 kilowatt or 22 kilowatt station, and neglect a more basic question: where exactly will it be, and which way will the charging cable face. In a home with two cars, the location determines much more than daily convenience – it determines whether both cars can enter and leave the parking area without rearranging the order every time.

Points worth checking on site in practice, not just on paper:

  • Where is the gasoline car's regular parking spot, and how far is it from the electrical panel.
  • Does the electric car enter the parking area first or second, and how does this affect the order of leaving in the morning.
  • The cable length required for the station to serve the electric car without the cable passing over the walkway or the other car's path.
  • Whether a single-phase or three-phase station is needed, according to the existing electrical infrastructure in the house.

In many homes, the simplest solution is to install the station next to the side of the parking area where the electric car regularly parks, so the cable doesn't need to cross the second car at all. In other cases, when it's not certain who will park where, it makes sense to choose a more central installation point that allows flexibility – but this depends on the specific parking layout of each home, and on a professional check of the distance from the electrical panel and the cabling route.

What happens when both cars “compete” for the same space

A common situation in households with one electric car and one gasoline car: the parking isn't arranged in two separate, fixed spots, but one car enters as needed, sometimes before the other. In such a case, if the charging station is installed too close to the boundary between the two parking spots, any change in the order of entry can make charging inaccessible, or require moving a car just to connect a cable.

The check recommended before installation isn't just “where is there a free wall”, but actually simulating a few days of routine: who comes in first in the morning, who comes back earlier in the evening, and where each car stands while the other is still on the way. A family whose gasoline car is used for daily commuting, while the electric car is parked at home for many more hours, will benefit from a station location that allows charging even when the gasoline car hasn't yet arrived – and not only when it's already in its spot.

This is where a pre-installation infrastructure check service, as carried out by DSGCharge, provides practical value: not just confirmation that the electrical panel supports the load, but also matching the station's location to how parking is actually managed between the two cars.

What's worth checking before rushing to install

Before booking an installation appointment, here are a few questions worth answering at the house itself, not just in a phone call:

  • What is the actual distance between the electric car's parking spot and the main electrical panel – this affects the length of cabling required and sometimes the complexity of the installation.
  • Is there a physical obstacle between the electrical panel and the parking area, such as a wall, a step or an underground passage, that will require a cable tray, chiseling or digging.
  • Is there single-phase or three-phase infrastructure in the house, because this affects the type of suitable station and the power that can be safely supported.
  • Is there a future intention to have a second electric car in the household – a question that changes the planning of the station's location and the size of the infrastructure it's recommended to prepare now.

The last point is becoming more and more prominent. Many families switch to electric cars gradually – one car is replaced, the second stays for a while, and only later is it replaced too. If this possibility is already checked at the first stage, you can avoid another new installation in a year or two, and plan a power point that will also allow a second station in the future, without tearing out trays or re-running cabling.

Station location when there's only one vehicle entrance to the yard

Many homes in Israel have a single vehicle entrance to the yard, through which both cars enter and leave. In such a case, the location of the charging station matters not only for the electric car itself, but also so that the gasoline car isn't blocked or “stuck” behind the electric car while it's plugged in to charge. If the electric car charges at night and the gasoline car needs to leave early in the morning before charging is complete, the physical parking order in the yard becomes a practical question, not a theoretical one.

A common solution is to position the station so that the electric car parks in a position that doesn't block the second car's exit, even if it means the cable has to be slightly longer. This is a decision worth making at the planning stage and not after installation, because relocating a station after the fact involves additional work.

In summary: proper planning prevents disruption to the daily use of both cars

Switching to an electric car in a home where the gasoline car is still around isn't just a technical question of kilowatts and power – it's a question of daily habits, parking order, and the time each member of the household spends with their car. A charging station that takes into account the physical location of both cars, the distance from the electrical panel, and the possibility of a second electric car in the future saves a lot of daily friction.

At DSGCharge, we check the home infrastructure, examine the actual parking layout, and match the type and location of the station to the specific situation of the house – including cases where you also need to plan for a second car that will join later. You can browse in EV charging stations suitable for a private house, and also check Charging cables in different lengths that suit non-standard distances between the parking area and the electrical panel.

Anyone who is currently at this stage – one electric car already at home, a gasoline car that continues to serve the family – is welcome to contact us for advice and a tailored charging solution that takes into account the exact situation in the yard, and not a generic solution that assumes there's only one car to deal with.

Frequently asked questions

If the gasoline car will be replaced by a second electric car in a year, can the infrastructure be prepared now?
Yes, this is a question worth raising in the initial infrastructure check. You can examine in advance whether the electrical panel has the potential to support a second station in the future, and plan the cabling location so that a future addition will be simpler, without committing now to installing a second station.

What if there's no fixed parking spot for each car, and they switch from day to day?
In such a case, the range of options is checked in practice – how many parking spots there are in the yard and how far each of them is from the electrical panel. Sometimes the right solution is a central station location with a cable long enough to allow flexibility, and sometimes it's better to position the station according to where the electric car parks on most days.

Do you need three-phase infrastructure to charge at a home with two cars?
It depends on the existing electrical infrastructure in the house and the type of station chosen, not on the mere presence of a second car in the yard. The pre-installation infrastructure check determines whether the house is single-phase or three-phase, and the matching is done accordingly, and in any case by a qualified professional.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 