Range and charging rate by car model

Electric vehicles have two charging methods:

  • AC charging. This type of charging is suitable for home charging.
  • DC charging. This type of charging is mainly suitable forPublic charging stations fast and ultra-fast.

You can compare all DSGCharge models, from home AC charging stations to DC fast charging stations, on the page EV charging stations.

Home charging (AC)

An electric vehicle's charging rate is affected by two parameters:

  • The charging rate the vehicle can accept: 7.4/11/22 kilowatts.
  • The power of the electricity supply to the charging station.

A few vehicles charge on single-phase power (7.4 kilowatts), and most vehicles on the road today charge on three-phase power (11/22 kilowatts).

The vast majority of vehicles on the road today can accept charging at 11 kilowatts. This means that even if you connect the vehicle to a 22 kilowatt charging station, the vehicle won't charge at a rate of 22 kilowatts.

Moreover, for a vehicle to charge at 22 kilowatts, two conditions must be met at the same time:

  • The electricity supplying the station must provide 32 amps.
  • The vehicle can accept 22 kilowatt (32 amp) charging.

As already mentioned, the vast majority of vehicles can't charge at a rate of 22 kilowatts, and most homes don't have a three-phase connection that supports 32 amps at all. The standard in Israel is a three-phase connection of only 25 amps, and anyone who has more than this connection has had it upgraded by the Israel Electric Corporation (IEC).

Therefore, when buying a charging station, you should take into account whether the home's electrical infrastructure supports a 22 kilowatt charging station, whether the vehicle can charge at a rate of 22 kilowatts, and whether it's worth buying the more expensive product when the vehicle won't be able to charge at the rate the charger provides at all. The only consideration that can support buying a 22 kilowatt charger is that a future vehicle may charge faster, but only on condition that you upgrade the home's electrical connection.

Fast and ultra-fast charging (DC)

Every electric vehicle has a fast charging option whose rate varies from vehicle to vehicle and ranges between 50-150 kilowatts.

Fast charging is carried out using DC fast charging stations whose charging rate ranges between 30-350 kilowatts.

Connecting the vehicle to ultra-fast charging isn't healthy for battery life, and regular use may shorten the battery's lifespan. Therefore, ultra-fast charging stations should be used only when there's no choice and not on a regular basis.

Home charging (AC) is much “healthier” for the vehicle's battery life.

Driving ranges and charging rates by manufacturer and model

Manufacturer Models Driving range (km) Charging rate (kW)
AIWAYS U540511
 U640511
AUDIQ451011
Q850811
e-tron GT47811
BMWI4461-50311
I555011
I7583-60011
IX1425-45411
IX2425-45411
IX345611
IX408-60011
BYDDOLPHIN42711
ATTO 342011
TANG4007
SEAL520-57011
HAN52111
CITROENC435011
BERLINGO26711
JUMPY31611
CHERYFX43011
CHEVROLET SILVERADO500-7207
DSTENSE 339511
EVEASYLIMO45011
FIAT500190-32011
FORDF-150 LIGHTNING390-5107
MACH E3957
FORTINGFRIDAY51011
GACGE33097
GENESISGV60466-51711
GILIGEOMETRY C359-48511
GMCHAMER500-7207
HYUNDAIKONA49011
IONIQ 5430-48122
IONIQ 6430-48122
JACJS441011
JAGARI PACE42011
JAKOJ640011
KIANIRO46011
EV6484-52811
EV9505-56311
LEAPMOTORTO32807
C11480-60011
LEXUSRZ43611
UX300E44711
MAXUSEUNIQ 54377
+EUNIQ 54007/11
EUNIQ 65607
EDELIVER 33717
EDELIVER 93427
MERCEDESEQA470-51011
EQB41011
EQC41211
EQE510-58011
EQS57911
MG4385-52011
538011
ZS44011
MARVEL R37011
MINIELECTRIC22811
NETAAYA301-4017
V4017
NIOEL6406-52311
EL7471-50111
ES84667
ET5451-58311
ET7505-58011
NISSANLEEF45822
OPELCORSA3497
GRANDLAND52422
MOKKA32711
ORA03310-42011
07440-57011
PEUGEOT2083397
20083397
POLESTAR2463-54611
365011
PORSCHETAYCAN407-50411
RENAULTMEGANE-E 44911
ZOE30622
SERES33317
550011
SMART1400-44022
3415-43522
SKODAENYAQ51711
SKYWELLET5400-48911
TESLA352811
Y53311
S60011
TOYOTABZ4X50211
VOYAHFREE50011
DREAM48011
VMEX5Z4207
VOLKSWAGENID4507-52711
ID5522-54611
VOLVOC40526-57811
EX30344-44811/22
EX9060022
XC40504-57311
XPENGG643011
G946011
P750511
ZEEKR01580-62022
X425-44522

The data is based on vehicle manufacturers' reports (WLTP); actual figures may be lower.

If you find a mistake, we'd be glad if you let us know.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar