{"id":42907,"date":"2026-08-18T14:25:28","date_gmt":"2026-08-18T14:25:28","guid":{"rendered":"https:\/\/dsgcs.co.il\/?p=42907"},"modified":"2026-11-01T16:07:55","modified_gmt":"2026-11-01T16:07:55","slug":"tashtit-tzina-dayar-sheni-rechev-chashmali-binyan","status":"publish","type":"post","link":"https:\/\/dsgcs.co.il\/en\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/","title":{"rendered":"A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building"},"content":{"rendered":"<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2026\/08\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan-20260818142355.png\" alt=\"A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building\" loading=\"eager\" \/><\/figure>\n\n<div class=\"se-post\">\n    <h1>A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building<\/h1>\n\n    <p>About six months ago, the building committee installed a charging station for a resident on the third floor. Everything worked fine, the electrician closed the file, and nobody thought about it again. Until a week ago, when a resident from the first floor announced that she's buying an electric vehicle and is also asking for a charging station in her parking space. In most cases, the building committee simply didn't know how to respond &#8211; is this like adding another air conditioner, or is there a much more fundamental question here that concerns the building's entire electrical infrastructure?<\/p>\n\n<p>This is exactly the point where many building committees and property management offices go wrong. A single charging station, installed as a one-off project for one resident, isn't necessarily ready to take on a second or third resident. The difference between &#8220;connecting another station&#8221; and &#8220;building a system that can handle several users&#8221; is the difference between a solution that works today and collapses in a year, and infrastructure that grows quietly with the building.<\/p>\n\n<h2>What actually gets checked when another electric vehicle joins the building<\/h2>\n<p>When the first station was installed, someone surely checked how much additional load the building's main electrical panel could take. That check was based on the consumption of one vehicle charging, at certain hours, at a defined power. As soon as a second resident enters the picture, those assumptions are no longer enough. The key question isn't &#8220;is there room for another station in the parking area&#8221; but &#8220;is there additional room in the electrical panel, and under what conditions&#8221;. This includes checking the size of the building's main meter, the connection type (single-phase or three-phase), and what actually happens if two vehicles charge at the same time in the evening, when other apartments are also running air conditioners, electric water heaters and ovens. Infrastructure designed &#8220;in advance&#8221; during the first installation, with growth in mind, handles this scenario relatively easily. Infrastructure designed solely for the needs of one resident, without an eye to the future, may require significant infrastructure work at this stage &#8211; not just connecting another station.<\/p>\n\n<h2>Shared load vs. electrical infrastructure in the entrance room<\/h2>\n<p>One of the first questions a building committee needs to ask is where the existing station is actually connected &#8211; to the building's main electrical panel, or to that resident's private electricity inside their apartment. This changes everything. If the first station was connected to the private electricity of the third-floor resident, there is still no &#8220;building system&#8221; here &#8211; there are simply two separate private installations, each dependent only on that apartment's private infrastructure. In that case, the resident who wants a new station will need a separate check of her own electrical infrastructure only, regardless of the previous installation. But if the first installation was done from the building's common electrical panel &#8211; for example, through a sub-panel allocated to the parking area &#8211; then every additional station &#8220;shares&#8221; the same power source with the existing station. This is where the question of load management comes in: a system that properly manages the distribution between several stations can prevent a situation in which two vehicles charging at the same time blow a fuse, cause a voltage drop, or affect the regular electricity consumption of other apartments in the building.<\/p>\n\n<h2>What happens when more residents join in the future<\/h2>\n<p>A second resident is exactly the test &#8211; of what will happen when there are three, four or ten. In many apartment buildings, one electric vehicle is just the beginning. If the infrastructure is planned per resident each time from scratch, without an overall view, the building committee may find itself going back to the same infrastructure check again and again, and ordering partial dismantling and installation work that makes the overall process more expensive in the long run. In contrast, a managed charging system for apartment buildings is built from the ground up to address this scenario: it allows dynamic power distribution between all connected stations, so that when one vehicle charges alone it has access to higher power, and when several vehicles charge at once the system distributes the available capacity among all of them without exceeding the building's electrical limit. This changes the question from &#8220;is there room for another station&#8221; to &#8220;how do you add another station to a system that already knows how to expand&#8221;.<\/p>\n\n<h2>What changes in permission and billing management when there's more than one user<\/h2>\n<p>As long as there was only one resident with a charging station, there was no need to think too much about questions of access permissions or billing separation &#8211; it was one station and one user. As soon as a second resident comes in, things get complicated: who uses whose station, how do you prevent an unknown person from connecting, and how does each resident get billed accurately for their own consumption rather than for shared consumption settled informally among all the residents. This is where tools come into the picture such as permission management via an app, user identification (for example, with an RFID card), and payment processing and billing that let each resident see exactly how much they consumed and pay for it separately. OCPP-based communication also lets the management company see the status of all stations remotely, identify faults and make sure the system is working as planned &#8211; without needing a physical on-site check every time something looks wrong.<\/p>\n\n<h2>When exactly should the building committee go back to the installation company<\/h2>\n<p>There's no need to &#8220;fear&#8221; every new request from a resident, but there is a clear moment when it's worth stopping and getting a professional check before moving on. That moment is exactly when a second resident appears. It's the first sign that the single station is about to become an ongoing need of the building, not a one-off project. A professional infrastructure check at this stage examines how much spare capacity there is in the building's electrical panel, whether it's worth upgrading the sub-panel or installing a load management system that will optimize the existing distribution, and which solution suits the number of residents who are already showing interest &#8211; not just the two who have asked so far. A building committee that orders this check early, before approving the second resident, saves itself the need to dismantle and reinstall a few months later when a third resident joins.<\/p>\n\n<h2>A checklist for the building committee before approving an additional station<\/h2>\n<ul>\n<li>Check whether the existing station is connected to the building's common electrical panel or to the resident's private electricity<\/li>\n<li>Find out the size of the building's main connection (single-phase or three-phase) and the actual spare capacity<\/li>\n<li>Ask whether other residents are already planning to buy an electric vehicle in the near future<\/li>\n<li>Consider whether it's right to install another single station, or to switch to a managed charging system with load management between all the stations<\/li>\n<li>Check how billing and separation between residents will be handled &#8211; and don't leave it as a verbal agreement<\/li>\n<li>Make sure the installation is carried out by a certified professional in accordance with the requirements of the law and the standard, including coordination with the building's electrician<\/li>\n<\/ul>\n\n<p>A building committee facing this question doesn't have to solve it alone. <a href=\"https:\/\/dsgcs.co.il\/en\/\">DSGCharge<\/a> supports apartment buildings with infrastructure checks before adding stations, and in choosing a solution that suits the expected number of residents &#8211; including <a href=\"https:\/\/dsgcs.co.il\/en\/shop\/\">charging systems with load management for buildings<\/a> that expand gradually without requiring a full upgrade every time another resident joins. Anyone who wants to understand the available range can also browse the<a href=\"https:\/\/dsgcs.co.il\/en\/shop\/\">Charging station and accessories store<\/a> to get a general sense before a consultation.<\/p>\n\n<p>If your building already has one charging station and a second request comes in, this is the right time to check the infrastructure before giving approval &#8211; not after a problem is discovered. Seeking professional consultation at this stage lets the building committee understand exactly what the current situation is, and which charging solution will properly serve both the second resident and the residents who follow.<\/p>\r\n\r\n<h3>What happens if the existing infrastructure wasn't designed to take on an additional resident?<\/h3>\n<p>In that case there are usually two options: adding a separate station with an independent connection, if there's enough spare capacity in the electrical panel, or switching to a managed charging system that distributes the existing power between all the stations in the building. The choice depends on an infrastructure check that maps the actual situation.<\/p>\n<h3>Do you need three-phase electricity to support several residents with electric vehicles?<\/h3>\n<p>It depends on the total power required and the number of planned stations. Not every building with several residents needs a three-phase connection, but this is one of the questions checked in the infrastructure check before deciding on the right charging solution.<\/p>\n<h3>Who is supposed to pay for upgrading the infrastructure when another resident joins?<\/h3>\n<p>This is a question of residents' agreement and the management of the apartment building, not a technical issue. Professionally, it's worth first getting an infrastructure check and a clear proposed solution, and only then discussing in the building committee how the costs will be divided among the residents who use it.<\/p>\r\n\r\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-white-color has-main-theme-background-color has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/dsgcs.co.il\/en\/contacts\/\">For advice and a tailored charging solution<\/a><\/div>\n<\/div>\r\n\r\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-white-color has-black-background-color has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/dsgcs.co.il\/en\/shop\/\">To the charging stations and accessories store<\/a><\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>A guide for building committees or management companies dealing with a second resident who buys an electric vehicle, after charging infrastructure has already been installed for a previous resident. What to check, how to manage loads and power allocation, and when to go back to the installation company.<\/p>","protected":false},"author":1,"featured_media":42908,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-42907","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electric-cars"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>A second resident bought an electric car: what happens to the charging infrastructure you&#039;ve already installed in the building<\/title>\n<meta name=\"description\" content=\"For building committees and management companies when a second resident buys an EV after charging was installed: what to check and how to manage loads.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dsgcs.co.il\/en\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"A second resident bought an electric car: what happens to the charging infrastructure you&#039;ve already installed in the building\" \/>\n<meta property=\"og:description\" content=\"For building committees and management companies when a second resident buys an EV after charging was installed: what to check and how to manage loads.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dsgcs.co.il\/en\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/\" \/>\n<meta property=\"og:site_name\" content=\"DSGCharge\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/dsgcharge\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-18T14:25:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-01T16:07:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2026\/08\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan-20260818142355.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\\\/\"},\"author\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/en\\\/#organization\"},\"headline\":\"A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building\",\"datePublished\":\"2026-08-18T14:25:28+00:00\",\"dateModified\":\"2026-11-01T16:07:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\\\/\"},\"wordCount\":16,\"publisher\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dsgcs.co.il\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan-20260818142355.png\",\"articleSection\":[\"Electric cars\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\\\/\",\"url\":\"https:\\\/\\\/dsgcs.co.il\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\\\/\",\"name\":\"A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dsgcs.co.il\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan-20260818142355.png\",\"datePublished\":\"2026-08-18T14:25:28+00:00\",\"dateModified\":\"2026-11-01T16:07:55+00:00\",\"description\":\"For building committees and management companies when a second resident buys an EV after charging was installed: what to check and how to manage loads.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dsgcs.co.il\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dsgcs.co.il\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan-20260818142355.png\",\"contentUrl\":\"https:\\\/\\\/dsgcs.co.il\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan-20260818142355.png\",\"width\":1024,\"height\":1024,\"caption\":\"A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dsgcs.co.il\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/#website\",\"url\":\"https:\\\/\\\/dsgcs.co.il\\\/\",\"name\":\"DSGCharge\",\"description\":\"Charging stations, cables and accessories for charging electric vehicles\",\"publisher\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dsgcs.co.il\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\",\"alternateName\":\"DSG Charging Solutions\"},{\"@type\":[\"Organization\",\"LocalBusiness\"],\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/#organization\",\"name\":\"DSGCharge\",\"alternateName\":[\"DSG Charging Solutions\",\"DSG Charge\",\"DSG\",\"DSG\",\"DSG\",\"DSGCharge Israel\"],\"url\":\"https:\\\/\\\/dsgcs.co.il\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/dsgcs.co.il\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/DSG-20-qq9w0rwqqv5301jxjn80z0oqv7mpm7wfpue58c3j7k.png\",\"contentUrl\":\"https:\\\/\\\/dsgcs.co.il\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/DSG-20-qq9w0rwqqv5301jxjn80z0oqv7mpm7wfpue58c3j7k.png\",\"width\":129,\"height\":60,\"caption\":\"DSG Charging Solutions\"},\"image\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/dsgcharge\",\"https:\\\/\\\/www.instagram.com\\\/dsgcs\\\/\",\"https:\\\/\\\/g.page\\\/r\\\/CUvbai9hmVXrEBM\"],\"telephone\":\"+972-77-9920350\",\"email\":\"info@dsgcs.co.il\",\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Sunday\",\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\"],\"opens\":\"09:00\",\"closes\":\"17:00\"}],\"areaServed\":{\"@type\":\"Country\",\"name\":\"Israel\"},\"contactPoint\":[{\"@type\":\"ContactPoint\",\"telephone\":\"+972-77-9920350\",\"contactType\":\"customer service\",\"availableLanguage\":[\"Hebrew\"]}],\"priceRange\":\"\u20aa\u20aa\",\"description\":\"DSGCharge (DSG Charging Solutions) is one of Israel's leading companies in EV charging solutions and the importer of charging stations and EV charging accessories in Israel \u2013 the DSGCharge brand is its own. Active since 2021, with about 20,000 chargers and charging stations sold and installed, nationwide installation and service, and setup and management of managed charging systems for buildings, parking facilities and vehicle fleets, with an operations system for public charging stations developed by the company (app, payment terminals, license plate recognition cameras and cloud management) that can be customized and branded to the customer's requirements.\",\"foundingDate\":\"2021\",\"slogan\":\"The importer of its charging stations \u2013 and the brand is its own\",\"knowsAbout\":[\"EV charging stations\",\"Managed charging stations\",\"OCPP\",\"DC fast chargers\",\"Load management\",\"Charging in apartment buildings\",\"Billing residents by TOU meter\",\"Charging networks in parking facilities\",\"EV fleet management\",\"Charging station installation\",\"CCS1 CCS2 Type 2 charging adapters\",\"Operating system for public charging stations\",\"Payment terminals for charging stations\",\"License plate recognition at charging stations\",\"Charging management system branded for the customer (White Label)\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building","description":"For building committees and management companies when a second resident buys an EV after charging was installed: what to check and how to manage loads.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dsgcs.co.il\/en\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/","og_locale":"en_US","og_type":"article","og_title":"A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building","og_description":"For building committees and management companies when a second resident buys an EV after charging was installed: what to check and how to manage loads.","og_url":"https:\/\/dsgcs.co.il\/en\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/","og_site_name":"DSGCharge","article_publisher":"https:\/\/www.facebook.com\/dsgcharge","article_published_time":"2026-08-18T14:25:28+00:00","article_modified_time":"2026-11-01T16:07:55+00:00","og_image":[{"url":"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2026\/08\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan-20260818142355.png","width":1024,"height":1024,"type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dsgcs.co.il\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/#article","isPartOf":{"@id":"https:\/\/dsgcs.co.il\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/"},"author":{"@id":"https:\/\/dsgcs.co.il\/en\/#organization"},"headline":"A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building","datePublished":"2026-08-18T14:25:28+00:00","dateModified":"2026-11-01T16:07:55+00:00","mainEntityOfPage":{"@id":"https:\/\/dsgcs.co.il\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/"},"wordCount":16,"publisher":{"@id":"https:\/\/dsgcs.co.il\/en\/#organization"},"image":{"@id":"https:\/\/dsgcs.co.il\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/#primaryimage"},"thumbnailUrl":"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2026\/08\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan-20260818142355.png","articleSection":["Electric cars"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/dsgcs.co.il\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/","url":"https:\/\/dsgcs.co.il\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/","name":"A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building","isPartOf":{"@id":"https:\/\/dsgcs.co.il\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dsgcs.co.il\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/#primaryimage"},"image":{"@id":"https:\/\/dsgcs.co.il\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/#primaryimage"},"thumbnailUrl":"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2026\/08\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan-20260818142355.png","datePublished":"2026-08-18T14:25:28+00:00","dateModified":"2026-11-01T16:07:55+00:00","description":"For building committees and management companies when a second resident buys an EV after charging was installed: what to check and how to manage loads.","breadcrumb":{"@id":"https:\/\/dsgcs.co.il\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dsgcs.co.il\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/dsgcs.co.il\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/#primaryimage","url":"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2026\/08\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan-20260818142355.png","contentUrl":"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2026\/08\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan-20260818142355.png","width":1024,"height":1024,"caption":"A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building"},{"@type":"BreadcrumbList","@id":"https:\/\/dsgcs.co.il\/tashtit-tzina-dayar-sheni-rechev-chashmali-binyan\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dsgcs.co.il\/"},{"@type":"ListItem","position":2,"name":"A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building"}]},{"@type":"WebSite","@id":"https:\/\/dsgcs.co.il\/#website","url":"https:\/\/dsgcs.co.il\/","name":"DSGCharge","description":"Charging stations, cables and accessories for charging electric vehicles","publisher":{"@id":"https:\/\/dsgcs.co.il\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dsgcs.co.il\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US","alternateName":"DSG Charging Solutions"},{"@type":["Organization","LocalBusiness"],"@id":"https:\/\/dsgcs.co.il\/#organization","name":"DSGCharge","alternateName":["DSG Charging Solutions","DSG Charge","DSG","DSG","DSG","DSGCharge Israel"],"url":"https:\/\/dsgcs.co.il\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/dsgcs.co.il\/#\/schema\/logo\/image\/","url":"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2024\/10\/DSG-20-qq9w0rwqqv5301jxjn80z0oqv7mpm7wfpue58c3j7k.png","contentUrl":"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2024\/10\/DSG-20-qq9w0rwqqv5301jxjn80z0oqv7mpm7wfpue58c3j7k.png","width":129,"height":60,"caption":"DSG Charging Solutions"},"image":{"@id":"https:\/\/dsgcs.co.il\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/dsgcharge","https:\/\/www.instagram.com\/dsgcs\/","https:\/\/g.page\/r\/CUvbai9hmVXrEBM"],"telephone":"+972-77-9920350","email":"info@dsgcs.co.il","openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Sunday","Monday","Tuesday","Wednesday","Thursday"],"opens":"09:00","closes":"17:00"}],"areaServed":{"@type":"Country","name":"Israel"},"contactPoint":[{"@type":"ContactPoint","telephone":"+972-77-9920350","contactType":"customer service","availableLanguage":["Hebrew"]}],"priceRange":"\u20aa\u20aa","description":"DSGCharge (DSG Charging Solutions) is one of Israel's leading companies in EV charging solutions and the importer of charging stations and EV charging accessories in Israel \u2013 the DSGCharge brand is its own. Active since 2021, with about 20,000 chargers and charging stations sold and installed, nationwide installation and service, and setup and management of managed charging systems for buildings, parking facilities and vehicle fleets, with an operations system for public charging stations developed by the company (app, payment terminals, license plate recognition cameras and cloud management) that can be customized and branded to the customer's requirements.","foundingDate":"2021","slogan":"The importer of its charging stations \u2013 and the brand is its own","knowsAbout":["EV charging stations","Managed charging stations","OCPP","DC fast chargers","Load management","Charging in apartment buildings","Billing residents by TOU meter","Charging networks in parking facilities","EV fleet management","Charging station installation","CCS1 CCS2 Type 2 charging adapters","Operating system for public charging stations","Payment terminals for charging stations","License plate recognition at charging stations","Charging management system branded for the customer (White Label)"]}]}},"_links":{"self":[{"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/posts\/42907","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/comments?post=42907"}],"version-history":[{"count":2,"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/posts\/42907\/revisions"}],"predecessor-version":[{"id":43576,"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/posts\/42907\/revisions\/43576"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/media\/42908"}],"wp:attachment":[{"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/media?parent=42907"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/categories?post=42907"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/tags?post=42907"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}