{"id":42651,"date":"2026-06-14T12:49:07","date_gmt":"2026-06-14T12:49:07","guid":{"rendered":"https:\/\/dsgcs.co.il\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/"},"modified":"2026-11-27T23:15:23","modified_gmt":"2026-11-27T23:15:23","slug":"shigrug-luach-hashmal-tlath-fazi-emdat-teina","status":"publish","type":"post","link":"https:\/\/dsgcs.co.il\/en\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/","title":{"rendered":"Upgrading a three-phase electrical panel for an EV charging station: a professional guide from DSGCharge"},"content":{"rendered":"<div class=\"se-post\">\n    <h1>Upgrading a three-phase electrical panel for an EV charging station: a professional guide from DSGCharge<\/h1>\n\n    <p>With the growing use of electric vehicles in Israel, the need for quality charging stations at home and in businesses has grown significantly. The electrical panel, and especially a three-phase panel, is a key component for the proper and safe operation of the charging station. In this article we examine the need to upgrade a three-phase electrical panel and present the advanced solutions of <a href=\"https:\/\/dsgcs.co.il\/en\/\">DSGCharge<\/a>.<\/p>\n\n<p>DSGCharge is a leader in EV charging solutions in Israel, with experience in installing charging stations and professional electrical infrastructure upgrades. Let's see why upgrading the electrical panel is critical for a business or home.<\/p>\n\n<p>Three-phase home charging stations, at 11kW and 22kW, can be compared on the page <a href=\"https:\/\/dsgcs.co.il\/en\/product-category\/\u05e2\u05de\u05d3\u05d5\u05ea-\u05d1\u05d9\u05ea\u05d9\u05d5\u05ea\/\">Home charging stations<\/a> in the DSGCharge store.<\/p>\n\n<h2>What is a three-phase electrical panel and why is it essential for a charging station?<\/h2>\n<p>A three-phase electrical panel supplies current on three separate phases, unlike a single-phase panel that supplies current from only one phase. Advanced charging stations, especially home and business ones, sometimes require a three-phase power supply for fast, efficient charging.<\/p>\n\n<p>Three-phase panels distribute the electrical load in a balanced way, reduce the risks of overload and voltage drops, and support the high power levels needed for fast charging of vehicles with large batteries.<\/p>\n\n<h2>When and how is a three-phase electrical panel upgrade needed for a charging station?<\/h2>\n<p>Before installing a charging station, make sure the existing electrical panel can handle the required load. A single-phase panel is usually not enough for fast charging or for several vehicles at once. An upgrade to a three-phase panel is needed in cases of:<\/p>\n<ul>\n<li>Fast charging or charging several vehicles simultaneously.<\/li>\n<li>An outdated electrical panel or one not suited to the new load.<\/li>\n<li>Businesses and complex infrastructure requiring long-term durability and safety.<\/li>\n<\/ul>\n\n<h2>Steps for upgrading a three-phase electrical panel with DSGCharge<\/h2>\n<p>The process begins with a professional assessment of the electrical infrastructure by a team of DSGCharge experts, including a check of the existing panel, load measurement and analysis of charging needs.<\/p>\n\n<p>Next comes customized planning, including selecting a quality three-phase panel, purchasing advanced equipment and professional installation in accordance with the Israeli standard and legal requirements. The upgrade includes adapting electrical protections, circuit breakers and communication between the charging station and the electrical panel.<\/p>\n\n<h2>The advantages of upgrading a three-phase electrical panel with DSGCharge<\/h2>\n<p>DSGCharge provides three-phase electrical panel upgrade solutions with an emphasis on reliability, safety and energy efficiency:<\/p>\n<ul>\n<li>Fast, stable charging, even under high loads.<\/li>\n<li>Preventing overload and voltage drops.<\/li>\n<li>Full compliance with the Israeli standard and legal requirements.<\/li>\n<li>Customization for all types of vehicles and stations \u2013 home, business and public.<\/li>\n<li>Professional service and support throughout the process.<\/li>\n<\/ul>\n\n<p>All upgrades are carried out by certified, experienced electricians, to ensure safe and efficient operation of the charging station.<\/p>\n\n<h2>How do you choose the right solution for you?<\/h2>\n<p>Choosing a suitable three-phase electrical panel depends on the number of vehicles, the vehicle type, electricity consumption and existing infrastructure. It is recommended to seek professional advice from the DSGCharge team, who will carry out an infrastructure survey and match the optimal solution for you.<\/p>\n\n<p>DSGCharge offers consultation, planning and fast installation of charging stations with three-phase electrical panel upgrades, including load management solutions and advanced communication between the system and the vehicle.<\/p>\n\n<p>For professional advice and a tailored charging solution, contact us via <a href=\"https:\/\/dsgcs.co.il\/en\/contacts\/\">Contact us<\/a> or visit the website <a href=\"\/en\/\">DSGCharge<\/a>.<\/p>\r\n\r\n<h2>Frequently asked questions about upgrading a three-phase electrical panel for a charging station<\/h2>\n\n<h3>When is a three-phase electrical panel upgrade needed for a charging station?<\/h3>\n<p>When the charging station requires more power than the existing electrical panel supplies, or when fast, stable charging is needed, especially in homes with several electric vehicles.<\/p>\n\n<h3>How long does the power outage last during the upgrade?<\/h3>\n<p>The length of the outage varies depending on the complexity of the upgrade. The DSGCharge team plans the work so that it is as short as possible, while maintaining the safety and proper functioning of the system.<\/p>\n\n<h3>Can an electrical panel upgrade be combined with installing a new charging station?<\/h3>\n<p>Yes, the electrical panel upgrade is usually done as part of installing a new charging station, to ensure full compatibility and maximum efficiency.<\/p>\r\n\r\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-white-color has-main-theme-background-color has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/dsgcs.co.il\/en\/contacts\/\">For advice and a tailored charging solution<\/a><\/div>\n<\/div>\r\n\r\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-white-color has-black-background-color has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/dsgcs.co.il\/en\/shop\/\">To the charging stations and accessories store<\/a><\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Upgrading a three-phase electrical panel is an essential step in installing an EV charging station at home or in a business. DSGCharge specializes in advanced charging solutions, including electrical infrastructure upgrades with an emphasis on safety, reliability and efficiency. In this guide we review when and why the upgrade is needed, how the process is carried out and what the main advantages are.<\/p>","protected":false},"author":6,"featured_media":42650,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-42651","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electric-cars"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Upgrading a three-phase panel for a charging station<\/title>\n<meta name=\"description\" content=\"A three-phase panel upgrade may be needed depending on power and load. Check the infrastructure, plan protections and install via a certified electrician.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dsgcs.co.il\/en\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Upgrading a three-phase panel for a charging station\" \/>\n<meta property=\"og:description\" content=\"A three-phase panel upgrade may be needed depending on power and load. Check the infrastructure, plan protections and install via a certified electrician.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dsgcs.co.il\/en\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/\" \/>\n<meta property=\"og:site_name\" content=\"DSGCharge\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/dsgcharge\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-14T12:49:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-27T23:15:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2026\/06\/dsgcs-article-image-20260614124905-try1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Hagai\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Hagai\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\\\/\"},\"author\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/en\\\/#organization\"},\"headline\":\"Upgrading a three-phase electrical panel for an EV charging station: a professional guide from DSGCharge\",\"datePublished\":\"2026-06-14T12:49:07+00:00\",\"dateModified\":\"2026-11-27T23:15:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\\\/\"},\"wordCount\":17,\"publisher\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dsgcs.co.il\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/dsgcs-article-image-20260614124905-try1.jpg\",\"articleSection\":[\"Electric cars\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\\\/\",\"url\":\"https:\\\/\\\/dsgcs.co.il\\\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\\\/\",\"name\":\"Upgrading a three-phase panel for a charging station\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dsgcs.co.il\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/dsgcs-article-image-20260614124905-try1.jpg\",\"datePublished\":\"2026-06-14T12:49:07+00:00\",\"dateModified\":\"2026-11-27T23:15:23+00:00\",\"description\":\"A three-phase panel upgrade may be needed depending on power and load. Check the infrastructure, plan protections and install via a certified electrician.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dsgcs.co.il\\\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dsgcs.co.il\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/dsgcs-article-image-20260614124905-try1.jpg\",\"contentUrl\":\"https:\\\/\\\/dsgcs.co.il\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/dsgcs-article-image-20260614124905-try1.jpg\",\"width\":1024,\"height\":1024},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dsgcs.co.il\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Upgrading a three-phase electrical panel for an EV charging station: a professional guide from DSGCharge\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/#website\",\"url\":\"https:\\\/\\\/dsgcs.co.il\\\/\",\"name\":\"DSGCharge\",\"description\":\"Charging stations, cables and accessories for charging electric vehicles\",\"publisher\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dsgcs.co.il\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\",\"alternateName\":\"DSG Charging Solutions\"},{\"@type\":[\"Organization\",\"LocalBusiness\"],\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/#organization\",\"name\":\"DSGCharge\",\"alternateName\":[\"DSG Charging Solutions\",\"DSG Charge\",\"DSG\",\"DSG\",\"DSG\",\"DSGCharge Israel\"],\"url\":\"https:\\\/\\\/dsgcs.co.il\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/dsgcs.co.il\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/DSG-20-qq9w0rwqqv5301jxjn80z0oqv7mpm7wfpue58c3j7k.png\",\"contentUrl\":\"https:\\\/\\\/dsgcs.co.il\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/DSG-20-qq9w0rwqqv5301jxjn80z0oqv7mpm7wfpue58c3j7k.png\",\"width\":129,\"height\":60,\"caption\":\"DSG Charging Solutions\"},\"image\":{\"@id\":\"https:\\\/\\\/dsgcs.co.il\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/dsgcharge\",\"https:\\\/\\\/www.instagram.com\\\/dsgcs\\\/\",\"https:\\\/\\\/g.page\\\/r\\\/CUvbai9hmVXrEBM\"],\"telephone\":\"+972-77-9920350\",\"email\":\"info@dsgcs.co.il\",\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Sunday\",\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\"],\"opens\":\"09:00\",\"closes\":\"17:00\"}],\"areaServed\":{\"@type\":\"Country\",\"name\":\"Israel\"},\"contactPoint\":[{\"@type\":\"ContactPoint\",\"telephone\":\"+972-77-9920350\",\"contactType\":\"customer service\",\"availableLanguage\":[\"Hebrew\"]}],\"priceRange\":\"\u20aa\u20aa\",\"description\":\"DSGCharge (DSG Charging Solutions) is one of Israel's leading companies in EV charging solutions and the importer of charging stations and EV charging accessories in Israel \u2013 the DSGCharge brand is its own. Active since 2021, with about 20,000 chargers and charging stations sold and installed, nationwide installation and service, and setup and management of managed charging systems for buildings, parking facilities and vehicle fleets, with an operations system for public charging stations developed by the company (app, payment terminals, license plate recognition cameras and cloud management) that can be customized and branded to the customer's requirements.\",\"foundingDate\":\"2021\",\"slogan\":\"The importer of its charging stations \u2013 and the brand is its own\",\"knowsAbout\":[\"EV charging stations\",\"Managed charging stations\",\"OCPP\",\"DC fast chargers\",\"Load management\",\"Charging in apartment buildings\",\"Billing residents by TOU meter\",\"Charging networks in parking facilities\",\"EV fleet management\",\"Charging station installation\",\"CCS1 CCS2 Type 2 charging adapters\",\"Operating system for public charging stations\",\"Payment terminals for charging stations\",\"License plate recognition at charging stations\",\"Charging management system branded for the customer (White Label)\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Upgrading a three-phase panel for a charging station","description":"A three-phase panel upgrade may be needed depending on power and load. Check the infrastructure, plan protections and install via a certified electrician.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dsgcs.co.il\/en\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/","og_locale":"en_US","og_type":"article","og_title":"Upgrading a three-phase panel for a charging station","og_description":"A three-phase panel upgrade may be needed depending on power and load. Check the infrastructure, plan protections and install via a certified electrician.","og_url":"https:\/\/dsgcs.co.il\/en\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/","og_site_name":"DSGCharge","article_publisher":"https:\/\/www.facebook.com\/dsgcharge","article_published_time":"2026-06-14T12:49:07+00:00","article_modified_time":"2026-11-27T23:15:23+00:00","og_image":[{"width":1024,"height":1024,"url":"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2026\/06\/dsgcs-article-image-20260614124905-try1.jpg","type":"image\/jpeg"}],"author":"Hagai","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Hagai"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dsgcs.co.il\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/#article","isPartOf":{"@id":"https:\/\/dsgcs.co.il\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/"},"author":{"@id":"https:\/\/dsgcs.co.il\/en\/#organization"},"headline":"Upgrading a three-phase electrical panel for an EV charging station: a professional guide from DSGCharge","datePublished":"2026-06-14T12:49:07+00:00","dateModified":"2026-11-27T23:15:23+00:00","mainEntityOfPage":{"@id":"https:\/\/dsgcs.co.il\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/"},"wordCount":17,"publisher":{"@id":"https:\/\/dsgcs.co.il\/en\/#organization"},"image":{"@id":"https:\/\/dsgcs.co.il\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/#primaryimage"},"thumbnailUrl":"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2026\/06\/dsgcs-article-image-20260614124905-try1.jpg","articleSection":["Electric cars"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/dsgcs.co.il\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/","url":"https:\/\/dsgcs.co.il\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/","name":"Upgrading a three-phase panel for a charging station","isPartOf":{"@id":"https:\/\/dsgcs.co.il\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dsgcs.co.il\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/#primaryimage"},"image":{"@id":"https:\/\/dsgcs.co.il\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/#primaryimage"},"thumbnailUrl":"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2026\/06\/dsgcs-article-image-20260614124905-try1.jpg","datePublished":"2026-06-14T12:49:07+00:00","dateModified":"2026-11-27T23:15:23+00:00","description":"A three-phase panel upgrade may be needed depending on power and load. Check the infrastructure, plan protections and install via a certified electrician.","breadcrumb":{"@id":"https:\/\/dsgcs.co.il\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dsgcs.co.il\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/dsgcs.co.il\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/#primaryimage","url":"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2026\/06\/dsgcs-article-image-20260614124905-try1.jpg","contentUrl":"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2026\/06\/dsgcs-article-image-20260614124905-try1.jpg","width":1024,"height":1024},{"@type":"BreadcrumbList","@id":"https:\/\/dsgcs.co.il\/shigrug-luach-hashmal-tlath-fazi-emdat-teina\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dsgcs.co.il\/"},{"@type":"ListItem","position":2,"name":"Upgrading a three-phase electrical panel for an EV charging station: a professional guide from DSGCharge"}]},{"@type":"WebSite","@id":"https:\/\/dsgcs.co.il\/#website","url":"https:\/\/dsgcs.co.il\/","name":"DSGCharge","description":"Charging stations, cables and accessories for charging electric vehicles","publisher":{"@id":"https:\/\/dsgcs.co.il\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dsgcs.co.il\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US","alternateName":"DSG Charging Solutions"},{"@type":["Organization","LocalBusiness"],"@id":"https:\/\/dsgcs.co.il\/#organization","name":"DSGCharge","alternateName":["DSG Charging Solutions","DSG Charge","DSG","DSG","DSG","DSGCharge Israel"],"url":"https:\/\/dsgcs.co.il\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/dsgcs.co.il\/#\/schema\/logo\/image\/","url":"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2024\/10\/DSG-20-qq9w0rwqqv5301jxjn80z0oqv7mpm7wfpue58c3j7k.png","contentUrl":"https:\/\/dsgcs.co.il\/wp-content\/uploads\/2024\/10\/DSG-20-qq9w0rwqqv5301jxjn80z0oqv7mpm7wfpue58c3j7k.png","width":129,"height":60,"caption":"DSG Charging Solutions"},"image":{"@id":"https:\/\/dsgcs.co.il\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/dsgcharge","https:\/\/www.instagram.com\/dsgcs\/","https:\/\/g.page\/r\/CUvbai9hmVXrEBM"],"telephone":"+972-77-9920350","email":"info@dsgcs.co.il","openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Sunday","Monday","Tuesday","Wednesday","Thursday"],"opens":"09:00","closes":"17:00"}],"areaServed":{"@type":"Country","name":"Israel"},"contactPoint":[{"@type":"ContactPoint","telephone":"+972-77-9920350","contactType":"customer service","availableLanguage":["Hebrew"]}],"priceRange":"\u20aa\u20aa","description":"DSGCharge (DSG Charging Solutions) is one of Israel's leading companies in EV charging solutions and the importer of charging stations and EV charging accessories in Israel \u2013 the DSGCharge brand is its own. Active since 2021, with about 20,000 chargers and charging stations sold and installed, nationwide installation and service, and setup and management of managed charging systems for buildings, parking facilities and vehicle fleets, with an operations system for public charging stations developed by the company (app, payment terminals, license plate recognition cameras and cloud management) that can be customized and branded to the customer's requirements.","foundingDate":"2021","slogan":"The importer of its charging stations \u2013 and the brand is its own","knowsAbout":["EV charging stations","Managed charging stations","OCPP","DC fast chargers","Load management","Charging in apartment buildings","Billing residents by TOU meter","Charging networks in parking facilities","EV fleet management","Charging station installation","CCS1 CCS2 Type 2 charging adapters","Operating system for public charging stations","Payment terminals for charging stations","License plate recognition at charging stations","Charging management system branded for the customer (White Label)"]}]}},"_links":{"self":[{"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/posts\/42651","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/comments?post=42651"}],"version-history":[{"count":3,"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/posts\/42651\/revisions"}],"predecessor-version":[{"id":44164,"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/posts\/42651\/revisions\/44164"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/media\/42650"}],"wp:attachment":[{"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/media?parent=42651"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/categories?post=42651"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dsgcs.co.il\/en\/wp-json\/wp\/v2\/tags?post=42651"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}